ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
12 Lead Motor Connection Weird
by emolatur - 01/19/22 02:40 PM
Any women electricians here?
by gfretwell - 01/17/22 01:44 PM
Well There's your problem.
by gfretwell - 01/08/22 12:17 AM
Happy New Year!!
by HotLine1 - 01/04/22 09:50 AM
Sangamo s309.2
by Robski - 12/31/21 04:54 PM
New in the Gallery:
240/208 to a house
240/208 to a house
by wa2ise, October 9
Now you know.
Now you know.
by Tom_Horne, September 7
Who's Online Now
1 members (Scott35), 48 guests, and 20 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#13692 09/09/02 09:43 PM
Joined: Jan 2002
Posts: 122
W
wirewiz Offline OP
Member
Recently had situation where I had to install a couple of commercial type ceiling fans. They were made by Dayton and did not mount to a standard ceiling fan junction box. Instead they were to be mounted using a lag bolt with an open hook the only way to install them with the boxes available were to use fan approved boxes and drill out 1/4" hole to a 3/8 hole in the box. (The box is supported by a U bolt around deep strut and the hook is bolted to the strut)

The other option would have been to use 4-0 box and knock out a 1/2" knockout with oversized washers. I chose the fan approved boxes since they seem a little more heavy duty.

What would you have done?
Wirewiz

#13693 09/09/02 10:01 PM
Joined: Jan 2002
Posts: 324
A
Member
I have done them the same as you. A real hassel isn't it? I have seen guys hang them using SJ cord with 15A male plug into a recept. I don't know how or where they made the connection that's usually in the canopy. Maybe they were fatory whipped that way (I hope).

#13694 09/10/02 12:00 AM
Joined: Jan 2002
Posts: 122
W
wirewiz Offline OP
Member
Arseegee, It wasn't so bad, I just like to know what I am going to be doing before I drive 45 miles!
The real kicker were the 2 remote mounted reversing switches that no one seemed to know about when it was bid. ( 4 extra wires and increased pipe size )
Soon as I opened the boxes and switches fell out [Linked Image] I knew I would be in for a few little surprises for the day.

This was one of those jobs where the mechanical contractor was supposed to install them after I ran power to a box, I said "just leave the fans and I'll hang em I'll have a lift here anyway no sense in you guys waisting a trip out" (Trying to be a nice guy always seems to bite me in the A**)
Any way still glad I did hang them because if I didn't open the boxes I would have had to make another trip out to install the reversing switches.
Wirewiz


Link Copied to Clipboard
Featured:

Tools for Electricians
Tools for Electricians
 

* * * * * * *

2020 Master Electrician Exam Preparation Combos
2020 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
HotLine1
HotLine1
Brick, NJ USA
Posts: 7,288
Joined: April 2002
Top Posters(30 Days)
NORCAL 1
grich 1
Popular Topics(Views)
288,122 Are you busy
220,219 Re: Forum
206,209 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.7.5