ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Admin 2
Recent Posts
2017 NEC Changes
by HotLine1. 12/11/17 12:10 PM
Casino Wiring methods
by HotLine1. 12/09/17 10:44 AM
Ground wire Size to water Line.
by HotLine1. 12/05/17 12:11 PM
Flexible conduit to an outside Spa
by gfretwell. 12/05/17 12:28 AM
Dimmable LED 2x4 lay in fixtures
by Vulsion. 11/30/17 06:37 PM
New in the Gallery:
Gallery Test
Popular Topics(Views)
243,013 Are you busy
179,411 Re: Forum
170,371 Need opinion
Who's Online Now
0 registered members (), 23 guests, and 12 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#124196 - 08/31/06 08:47 PM Spaghetti Service  
Admin  Offline

Administrator
Member
Joined: Oct 2000
Posts: 3,460
NY, USA
Quote
This is another of my old pictures. The service has been redone and they now have two 3,000 amp services, bus fed. I don't think anyone could afford to build one this way anymore with todays copper prices.

Alan Nadon
[Linked Image]

[Linked Image]

[Linked Image]

[This message has been edited by Webmaster (edited 08-31-2006).]


Tools for Electricians:

#124197 - 08/31/06 09:19 PM Re: Spaghetti Service  
LarryC  Offline
Member
Joined: Jul 2004
Posts: 783
Winchester, NH, US
What's with the little wires (voltage sense?)going thru the current xfmrs too?

Larry


#124198 - 08/31/06 09:38 PM Re: Spaghetti Service  
Wizzie Electric  Offline
Member
Joined: Jan 2006
Posts: 69
Maple Creek, Saskatchewan, Can...
At least it was nice and tidy.


Thanks.

#124199 - 08/31/06 11:48 PM Re: Spaghetti Service  
napervillesoundtech  Offline
Member
Joined: Feb 2006
Posts: 144
Naperville, IL, USA
That could be soo much worse. That bare neutral looks interesting. The service must not be too old, otherwise, that copper buss would have probably discolored or faded a little.


#124200 - 09/01/06 10:39 AM Re: Spaghetti Service  
Alan Nadon  Offline
Member
Joined: Mar 2005
Posts: 399
Elkhart, IN. USA
Small wires are from the C.T.s to the meter.

Picture was taken right after it was built it didn't have time to weather.

Hardest part was calculating the minimum size of the splice bar that was a POCO requirement, because they refused to make up that many splices.
Alan--


Alan--
If it was easy, anyone could do it.


Member Spotlight
Posts: 362
Joined: April 2003
Show All Member Profiles 
Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.011s Queries: 14 (0.002s) Memory: 0.7686 MB (Peak: 0.9074 MB) Zlib enabled. Server Time: 2017-12-12 14:09:07 UTC