ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals

>> Home   >> Electrical-Photos   >> Classifieds   >> Subscribe to Newsletter   >> Store  
 

Photos of the Week:

Tiled Backsplash
Tiled Backsplash Devices

Random Gallery Image:
Recent Gallery Topics:
What in Tarnation?
What in Tarnation?
by timmp, September 10
Plumber meets Electrician
Plumber meets Electrician
by timmp, September 10
Who's Online Now
0 members (), 508 guests, and 36 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 1 of 2 1 2
#124117 08/09/06 09:27 PM
Joined: Oct 2000
Posts: 3,669
Likes: 4
Admin Offline OP
Administrator
Member
submitted by trublu832:

[Linked Image]

Horizontal Ad
#124118 08/10/06 01:53 AM
Joined: Jan 2003
Posts: 4,391
I
Moderator
Many would call that a service loop.

There is still some conductor left if the connection goes bad you can cut it back and remake it.


Bob Badger
Construction & Maintenance Electrician
Massachusetts
#124119 08/19/06 03:36 PM
Joined: Nov 2005
Posts: 7
T
Junior Member
Is a service loop common practice for many ec's? Or just the pocos

#124120 08/19/06 03:57 PM
Joined: Mar 2005
Posts: 1,213
S
Member
It's required in the telecom industry for servicible equipment so that you can rack it out. They even have special spring-hinged bars to attach the cables to to make it cleaner.

#124121 08/19/06 08:50 PM
Joined: Jun 2005
Posts: 821
S
Member
Funny how the POCO isn't held to the same bend radius requirements that we have to uphold (assuming the poco's aluminum conductors are the same type aluminum as SE).

#124122 08/20/06 07:25 PM
Joined: Jun 2003
Posts: 681
P
Member
Shockme,

They do have bending radius to follow, maybe they just don't always enforce it.


Pierre Belarge
#124123 08/20/06 07:49 PM
Joined: Jan 2003
Posts: 4,391
I
Moderator
Do 600 volt conductors have bending radius restrictions?

I thought bending radius restrictions where limited to cables.


Bob Badger
Construction & Maintenance Electrician
Massachusetts
Horizontal Ad
#124124 08/22/06 10:14 PM
Joined: Feb 2003
Posts: 687
A
Member
I believe the intent of the loop instal was to allow for soil and conductor movement.

What happens sometimes is the ground settels or frost movement. The conductors get pulled to tight. The meter gets pulled from the wall. Meter guts crack and come close to shorting out.

Anyways around here for resi any work and the utility wants you to change from a pipe and meter to an underground meter set up (they call em wire ways). The point of the underground meter besides being an easy install is it allows room for the conductor to zig zag a few times before landing. No extra conductor zig zag then you can have the same problem of the conductors pulling things apart.

#124125 09/02/06 10:18 PM
Joined: Apr 2004
Posts: 812
Member
Here's a stupid question, which side is the line side? I would say the left, but I don't know if the POCO would have a disco or not.

Ian A.


Is there anyone on board who knows how to fly a plane?
#124126 09/03/06 12:21 AM
Joined: Oct 2004
Posts: 806
Member
Ian:

Line side is on the left. Notice the lugs lead to bus bars connected to the top clips.

Generally speaking, the top clips of a "Form(n)S" meter (Where (n) is a number representing the configuration and voltages) are always line side, the bottom clips are load side.

A Form 2S is the common residential meter, being 120/240 volt, single phase, 3 wire.

Now as to the pic:

Was this posted as being a violation? Or just for discussion? Despite the sticker on the pipe below the can being red (orange?) it looks like it says "Approved" on the top line.


Stupid should be painful.
Page 1 of 2 1 2

Link Copied to Clipboard
Advertisement:-Right


Tools for Electricians
Tools for Electricians
 

Member Spotlight
Radar
Radar
Los Angeles
Posts: 349
Joined: April 2004
Top Posters(30 Days)
Popular Topics(Views)
363,154 Are you busy
285,958 Re: Forum
264,537 Need opinion
New Page 2
Powered by UBB.threads™ PHP Forum Software 7.7.5