ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
Inspections and Testing
by gfretwell. 04/20/18 08:44 PM
FEMA height and electrical equiment.,
by HotLine1. 04/20/18 08:49 AM
This anti-theist is priceless!!!
by LongRunner. 04/19/18 04:02 PM
Recall notice: Square D Services Switches
by gfretwell. 04/18/18 01:24 PM
Big Square D service switch Recall
by sparkyinak. 04/18/18 12:30 AM
New in the Gallery:
Housebilding DIY wiring
SE cable question
Who's Online Now
1 registered members (gfretwell), 33 guests, and 8 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 1 of 2 1 2
Meter Drip Loops #124117
08/09/06 09:27 PM
08/09/06 09:27 PM
Admin  Offline
OP
Administrator
Member
Joined: Oct 2000
Posts: 3,495
NY, USA
submitted by trublu832:

[Linked Image]

Tools for Electricians:
Re: Meter Drip Loops #124118
08/10/06 01:53 AM
08/10/06 01:53 AM
I
iwire  Offline
Moderator
Joined: Jan 2003
Posts: 4,391
North Attleboro, MA USA
Many would call that a service loop.

There is still some conductor left if the connection goes bad you can cut it back and remake it.


Bob Badger
Construction & Maintenance Electrician
Massachusetts
Re: Meter Drip Loops #124119
08/19/06 03:36 PM
08/19/06 03:36 PM
T
trublu832  Offline
Junior Member
Joined: Nov 2005
Posts: 7
Fort Wayne, IN, U.S.A.
Is a service loop common practice for many ec's? Or just the pocos

Re: Meter Drip Loops #124120
08/19/06 03:57 PM
08/19/06 03:57 PM
S
SteveFehr  Offline
Member
Joined: Mar 2005
Posts: 1,213
Chesapeake, VA
It's required in the telecom industry for servicible equipment so that you can rack it out. They even have special spring-hinged bars to attach the cables to to make it cleaner.

Re: Meter Drip Loops #124121
08/19/06 08:50 PM
08/19/06 08:50 PM
S
ShockMe77  Offline
Member
Joined: Jun 2005
Posts: 821
Rahway, New Jersey
Funny how the POCO isn't held to the same bend radius requirements that we have to uphold (assuming the poco's aluminum conductors are the same type aluminum as SE).

Re: Meter Drip Loops #124122
08/20/06 07:25 PM
08/20/06 07:25 PM
P
PCBelarge  Offline
Member
Joined: Jun 2003
Posts: 681
Dobbs Ferry, NY, USA
Shockme,

They do have bending radius to follow, maybe they just don't always enforce it.


Pierre Belarge
Re: Meter Drip Loops #124123
08/20/06 07:49 PM
08/20/06 07:49 PM
I
iwire  Offline
Moderator
Joined: Jan 2003
Posts: 4,391
North Attleboro, MA USA
Do 600 volt conductors have bending radius restrictions?

I thought bending radius restrictions where limited to cables.


Bob Badger
Construction & Maintenance Electrician
Massachusetts
Re: Meter Drip Loops #124124
08/22/06 10:14 PM
08/22/06 10:14 PM
A
Active 1  Offline
Member
Joined: Feb 2003
Posts: 687
Grayslake IL, USA
I believe the intent of the loop instal was to allow for soil and conductor movement.

What happens sometimes is the ground settels or frost movement. The conductors get pulled to tight. The meter gets pulled from the wall. Meter guts crack and come close to shorting out.

Anyways around here for resi any work and the utility wants you to change from a pipe and meter to an underground meter set up (they call em wire ways). The point of the underground meter besides being an easy install is it allows room for the conductor to zig zag a few times before landing. No extra conductor zig zag then you can have the same problem of the conductors pulling things apart.

Re: Meter Drip Loops #124125
09/02/06 10:18 PM
09/02/06 10:18 PM
Theelectrikid  Offline
Member
Joined: Apr 2004
Posts: 810
Levittown, PA
Here's a stupid question, which side is the line side? I would say the left, but I don't know if the POCO would have a disco or not.

Ian A.


Is there anyone on board who knows how to fly a plane?
Re: Meter Drip Loops #124126
09/03/06 12:21 AM
09/03/06 12:21 AM
mxslick  Offline
Member
Joined: Oct 2004
Posts: 803
Atomic City, ID USA
Ian:

Line side is on the left. Notice the lugs lead to bus bars connected to the top clips.

Generally speaking, the top clips of a "Form(n)S" meter (Where (n) is a number representing the configuration and voltages) are always line side, the bottom clips are load side.

A Form 2S is the common residential meter, being 120/240 volt, single phase, 3 wire.

Now as to the pic:

Was this posted as being a violation? Or just for discussion? Despite the sticker on the pipe below the can being red (orange?) it looks like it says "Approved" on the top line.


Stupid should be painful.
Page 1 of 2 1 2

Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
noderaser
noderaser
Portland, Oregon, United States
Posts: 404
Joined: March 2007
Show All Member Profiles 
Top Posters(30 Days)
Popular Topics(Views)
245,860 Are you busy
182,901 Re: Forum
172,735 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.045s Queries: 15 (0.006s) Memory: 1.0231 MB (Peak: 1.2004 MB) Zlib enabled. Server Time: 2018-04-21 04:03:46 UTC