new 320A(400A)with two 200A 120/240V disconnects feeding two 200A subs. please don't be shy with comments thanks. jermaine
ICETA,NATAPHA,McDONALD
|
|
|
|
Joined: Feb 2005
Posts: 4
OP
Junior Member
|
sorry tried to attach pic but could not can u please help, jermaine
ICETA,NATAPHA,McDONALD
|
|
|
|
Joined: Dec 2005
Posts: 869 Likes: 4
Member
|
Hi IKAYLA welcome
You have to post a picture to one of the moderators and they will attach it to the thread.
Kind regards, Raymond
The product of rotation, excitation and flux produces electricty.
|
|
|
|
Joined: Jul 2002
Posts: 8,443 Likes: 3
Member
|
Jermaine, Welcome to the group. If you'd like to send the pic to me by clicking on the icon above this post of mine. I'd be happy to post it for you. [This message has been edited by Trumpy (edited 02-27-2006).]
|
|
|
|
Joined: Jul 2002
Posts: 8,443 Likes: 3
Member
|
Here we go:
|
|
|
|
Joined: Jul 2002
Posts: 717
Member
|
I always get a kick out of seeing conduit fittings used where a simple back to back set of 90's made from one pipe would do.
|
|
|
|
Joined: Jul 2002
Posts: 717
Member
|
That is a nice looking ON-Q job there. Hats off to that. Could you get us a picture of the top of the panels? Can't tell but would like to see how many romex cables per connector you have there. Nice neat work otherwise.
|
|
|
|
Joined: Dec 2000
Posts: 4,294
Member
|
|
|
|
|
Joined: Feb 2003
Posts: 687
Member
|
I was thinking the same about useing a back to back on the 1st picture. I try not to use 2" LB's for 3 3/0. I think it would have been a pain to pull thru those fittings. I will use a mogal type LB because they will fit the conductors without fighting, scraping, and pushing with objects.
Myself I would have used a 400 amp pedistal (the utility calls it a meter raceway) with two 200 amp breakers in it. One piece and your done. It would cost more at about $1200 for the part. The utility wants the pedistals for resi because of ground movement from the seasons can pull the conductors and cause a slow self destruction. The pedistals allow the conductors to be zig-zaged giving extra length for movement.
Did you build that inside wall for the electric?
The fitting under the panel I would have used a 90 or a j-box to make pulling easier.
Tom
|
|
|
|
Joined: Nov 2005
Posts: 507
Member
|
hind site is 20/20 and not to pour salt on an open wound, but why not use a trough from the meter to the bottom of both disconnects?
It would be a neat job, easier than pulling through 2 LB's and cost about the same. 3 nipples and a trough.
|
|
|