Nick You ARE da man! ![[Linked Image]](https://www.electrical-contractor.net/ubb/wink.gif) I rarely see conduit work that takes on a new meaning of "craftsmanship"! It looks like you evenly spaced all your KO's into the gutter! ![[Linked Image]](https://www.electrical-contractor.net/ubb/smile.gif) How long did that take? Things like this kinda make me feel "green" again! ![[Linked Image]](https://www.electrical-contractor.net/ubb/tongue.gif) -Randy (Edited cause I can't read this late LOL) [This message has been edited by Lostazhell (edited 04-21-2004).]
|
|
|
|
Joined: Apr 2002
Posts: 2,527
Moderator
|
Nick, that is a very clean installation.
Do you buy gutter without knockouts and cut them in the field?
|
|
|
|
Joined: Aug 2001
Posts: 599
Member
|
Bjarney, Absolutely. I cant figure out why they still sell gutters and pull boxes with concentric KO's any more. They are just in the way 95% of the time.
|
|
|
|
Joined: Jan 2003
Posts: 4,391
Moderator
|
Great looking work Nick. I can't figure out why they still sell gutters and pull boxes with concentric KO's any more. They are just in the way 95% of the time. I could not agree more, ![[Linked Image]](https://www.electrical-contractor.net/ubb/smile.gif) any commercial / industrial equipment should come without KOs. We try to get all we can without KOs but many times it is not a stock item. ![[Linked Image]](https://www.electrical-contractor.net/ubb/frown.gif) Sometimes it is almost imposable to do a professional looking job because of the factory KOs. Bob
Bob Badger Construction & Maintenance Electrician Massachusetts
|
|
|
|
Joined: Dec 2000
Posts: 4,291
OP
Member
|
Great stuff, Nick! It's sure nice to see something like this after the poorly-planned installations I've run across. The key is in the planning...The old "Measure twice, cut once".
Blank endwall panels and "-NK(no knockout)" wireways and boxes are worth any extra time and effort it takes to get them. There's not much use for those concentric KO's.
|
|
|
|
Joined: Jan 2002
Posts: 5
Junior Member
|
Could you tell us how long it took and how many guys it took too.
|
|
|
|
Joined: Apr 2002
Posts: 2,527
Moderator
|
electure—I agree with you on the plague of concentric (and eccentric) KOs. Talking to switchgear-manufacturing engineers—they dislike them too, for ‘one-pass’ punches and dies are a constant headache to keep sharp on the production line.
|
|
|
|
Joined: Apr 2003
Posts: 48
Member
|
Sweet Work!, Thats the type of installation I walk by and stare at for a few ! Just had to add my two cents!
|
|
|
|
Joined: Aug 2001
Posts: 599
Member
|
This was done a few years ago so I don't remember exactly how long it took. It was done by myself and a JW. He did all the pipe you see in the photos. There is something in the pics I thought someone might pick up on and bust my chops for but it's probably not obvious because of the resolution of the pics. I have the answer but lets keep it interesting and see if someone can pick it out! (Hint: The wall you see is 18 Gage steel studs and 5/8 drywall)
|
|
|