ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
Pull out fuse panel?
by gfretwell. 12/17/18 02:33 PM
Video door bell causing chime activation of coil
by gfretwell. 12/16/18 09:01 PM
Conduit fill Calculations
by gfretwell. 12/08/18 08:39 PM
Swimming Pool question
by HotLine1. 12/05/18 12:37 PM
Tingle off the water spigot
by rmiell. 11/30/18 01:03 PM
New in the Gallery:
What is this for?
Plug terminals
Who's Online Now
0 registered members (), 17 guests, and 13 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Roof Service #116541
04/08/04 07:06 AM
04/08/04 07:06 AM
electure  Offline
OP
Member
Joined: Dec 2000
Posts: 4,277
Fullerton, CA USA
Does this seem a little abnormal to you?


[Linked Image]


The HV lines come from the pole to a bracket with insulators mounted on the parapet of this building. Transformer is on the roof.

The secondaries come out the other side of the building (at far left). You can see 2 service risers, one in PVC conduit, the other in white SCH40 PVC water pipe.

Tools for Electricians:
Re: Roof Service #116542
04/08/04 08:29 AM
04/08/04 08:29 AM
E
Electricmanscott  Offline
Member
Joined: Jan 2002
Posts: 1,457
Holden, MA USA
Depends what country this is in.

Re: Roof Service #116543
04/08/04 11:37 AM
04/08/04 11:37 AM
Lostazhell  Offline
Member
Joined: Feb 2004
Posts: 1,431
Bakersfield, CA (Originally Or...
Judging from the colors of the buildings & the "rojo" on the ad at the top of the building. I'd say this is someplace south of the US border... (Mexico, Central or South America) From what I've seen down there... ANYTHING goes!

-Randy

Re: Roof Service #116544
04/08/04 05:08 PM
04/08/04 05:08 PM
electure  Offline
OP
Member
Joined: Dec 2000
Posts: 4,277
Fullerton, CA USA
No secret, it's in Mexico.
So, disregarding the plumbing pipe for a mast, does anyone ever see an overhead service to a building done like this?
I'm serious. I put up what I thought was an example of a strange way to do an underground service on another thread and found that it's just the way Easterners do them (and so do the utilities in Mexico)...S

Re: Roof Service #116545
04/08/04 05:58 PM
04/08/04 05:58 PM
B
Bjarney  Offline
Moderator
Joined: Apr 2002
Posts: 2,527
West-Southern Inner-Northeast ...
I’m guessing ~35kV, but that seems a bit unusual for a liquor store. In the US, a unit substation on a roof would more typically be found on an industrial occupancy.
[Linked Image]

Re: Roof Service #116546
04/08/04 09:47 PM
04/08/04 09:47 PM
Scott35  Offline

Broom Pusher and
Member
Joined: Oct 2000
Posts: 2,713
Anaheim, CA. USA
I did an EE set for a Bank T.I. in Westchester (1 mile from LAX Airport), and the original building (shell) was to have a setup similar to this - which was to be performed during a previously done remodel and addition to the entire building.

These plans were dated 1976, and the pages I am referring to were designed per LADWP Design Engineer's requests.

Was to have a Delta - Delta 750 KVA Transformer on the Roof, fed from overhead 13,200 VAC Primary Feeders to a dead-end rack.

I guess they scrapped these plans, and put everything underground instead.

It was a real eye catcher! Had to look three times at the Plan Page to make sure it was showing this!

All the Buildings in this area have the same model# GTE / Sylvania Gear (Main Breaker in the Pull Section, 800 amp rated multi meter sections, Federal Circuit Breakers, 1Ø 3 Wire).
Roof mounted HVAC equipment carries the wild phase and ends the grounded conductor at the service equipment - also located on roof / 2nd floor.

Scott


Scott " 35 " Thompson
Just Say NO To Green Eggs And Ham!

Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
mersadrad
mersadrad
Montreal, Quebec, Canada
Posts: 28
Joined: March 2011
Show All Member Profiles 
Top Posters(30 Days)
Popular Topics(Views)
252,283 Are you busy
189,230 Re: Forum
178,915 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.029s Queries: 14 (0.008s) Memory: 0.9780 MB (Peak: 1.1234 MB) Zlib enabled. Server Time: 2018-12-19 06:04:12 UTC