It's North of Irvine, CA. Sven!! El baile de los muertos? = Dance of the Dead?
OK, I'll come clean. This is in Santa Ana, CA., where it takes forever to get through Plan Check. (We've had plans spit out for corrections. After the 3rd revision, about 6 weeks,they were deemed OK. Then the field inspector came out, said that the job was done wrong, and said we had to do it the way we submitted the plans in the first place).
[This message has been edited by electure (edited 03-03-2004).]
Obviously, electure & I have dealt with the same people in our county seat of government!!! This would be the same city that made me pipe a future 1" conduit to accessible attic space... on a SURFACE mount panel! The homeowner was thrilled with having unnecessary conduit going up his wall... Another note, if anyone does a panel changeout here... make sure you use a side-by-side panel.. Even if its overhead feed.. they won't accept it if it can't be underground fed.... The city has a plan to go underground with their utilities.. (Which there.. means it'll happen in oh... about 300 years!) Maybe this outlet will be fixed by then too!
Looking at this closer... Is it just me or is there white paint on the plaster ears of that recept???? I wonder if that outlet was from some indoor location, removed & reused here... Not a good idea with those backwire only outlets!!! (not that they're a great idea when they're new!)