ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
IRC M1307.3
by gfretwell. 08/20/18 11:16 PM
Upgrade the old panel
by HotLine1. 08/20/18 07:00 PM
Light Pole Grounding
by HotLine1. 08/20/18 05:34 PM
Calling all Non-US members!! (Non-US only)
by Bill Addiss. 08/13/18 05:52 PM
depth of duckbank
by ghost307. 08/12/18 09:26 PM
New in the Gallery:
Plug terminals
Housebilding DIY wiring
Who's Online Now
0 registered members (), 5 guests, and 23 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 1 of 2 1 2
Ever Done This Before? #113494
06/17/02 09:54 AM
06/17/02 09:54 AM
Admin  Offline
OP
Administrator
Member
Joined: Oct 2000
Posts: 3,503
NY, USA
[Linked Image]
Quote
It's a straight pull, so why not take the conduit straight through the gutter box. Forget bothering with connectors. This is a quality contractor, is this quality work?

-Eandrew

Tools for Electricians:
Re: Ever Done This Before? #113495
06/17/02 10:03 AM
06/17/02 10:03 AM
G
George Corron  Offline
Member
Joined: May 2001
Posts: 717
Lorton, Va USA
Well............This is one I'd like to see the IEEE do an arc fault test on, and I'm sure they meant to come back and weld it later, if they're under the 96 code where that type of thing was still allowed [Linked Image]

.........Do you have to count the conductors inside the pipe as gutter fill ? [Linked Image]

Re: Ever Done This Before? #113496
06/17/02 10:24 AM
06/17/02 10:24 AM
N
nesparky  Offline
Member
Joined: Jun 2001
Posts: 642
omaha,ne
I doubt this would pass here.


ed
Re: Ever Done This Before? #113497
06/17/02 10:35 AM
06/17/02 10:35 AM
R
resqcapt19  Offline
Member
Joined: Nov 2000
Posts: 2,148
IL
I don't really see any problem with the installation as long as there is not a derating problem with the conductors in the large conduit between the wireway and the panel. It appears that the nipple may be less then 24" so that would not be problem. It would have been cheaper and easier to use a smaller wireway and install it in front of the large conduits that pass through the wireway in this installation. Is there a code violation here? I don't see one.
Don


Don(resqcapt19)
Re: Ever Done This Before? #113498
09/17/02 01:26 AM
09/17/02 01:26 AM
S
Sean WB  Offline
Member
Joined: Sep 2002
Posts: 111
South TX
maybe there was a bid change? I have waited on panels to come in , and because of time I ran pipe anyway, BELIEVING the panel would be as specified.
This would work.
I wish I had a pic of the last hospital we did . It was awesome. the inspectors said they never seen a cleaner installation.


I did not get as think so badly as you shocked I did.
Re: Ever Done This Before? #113499
09/17/02 06:35 AM
09/17/02 06:35 AM
E
Electricmanscott  Offline
Member
Joined: Jan 2002
Posts: 1,457
Holden, MA USA
It seems obvious to me that they did this because they needed the trough space for the smaller conduits to terminate as the panel would not have enough room for all of them. Looks like an ok job to me,if not a little bit of an odd setup. Why would this not pass inspection?

Re: Ever Done This Before? #113500
01/29/03 01:25 AM
01/29/03 01:25 AM
E
Elec_VA  Offline
Member
Joined: Jan 2003
Posts: 40
Sterling, VA, USA
I've done instillations that are similar to this before. I am a huge fan of using troughs and j-boxes to keep my penetrations into a back box at a minimum, especially in a very cramped electric room. I would rather set a few large runs of pipe into a panel from a trough than a ton of smaller runs, especially on a large job where you don't really know how well your guys can run pipe. Also, it's much easier to support four or five runs as apposed to twenty+ [Linked Image]


Pete
Re: Ever Done This Before? #113501
01/29/03 03:50 AM
01/29/03 03:50 AM
L
lighthouse  Offline
Member
Joined: Jan 2003
Posts: 134
philadelphia pa 19125
code 300-10 ...?

Re: Ever Done This Before? #113502
01/29/03 08:35 PM
01/29/03 08:35 PM
W
WattsPie  Offline
Junior Member
Joined: Jan 2003
Posts: 3
New Jersey
It appears to me that all the EMT tubing coming from the panel with the exception of the middle 2"EMT nipple pass directly thru the gutter box. I mean LOOK I DON'T SEE ANY CONNECTORS ON BOTTOM OF GUTTER BOX do you guys?

The 2"EMT enters the gutter box with a connector.I am assuming from there those circuits are taking off thru the various smaller pipes.

They obviously needed the top panel space for the larger pipes.I've seen this a hundred times.Except for pipes passing directly thru a gutter box as they appear to be doing!?

Without knowing the circumstances it's hard to second guess why they did it this way.

Re: Ever Done This Before? #113503
02/07/03 08:22 PM
02/07/03 08:22 PM
G
Gus1999  Offline
Member
Joined: Dec 2002
Posts: 24
Los Angeles, CA, USA
Hard to tell but I think we are being fooled here by poor photography. It looks to me that only the center 2in actually terminates into the gutter and is properly done with a connector. The other 4 1@1/2 may in fact be going behind the gutter all together. Note also that there are two levels of unistrut here. Is does look to me that the gutter is being soley supported by the conduits unless there are spacers with bolts behind it which I woudl guess there are.

Based on the rest of the job, I don't think this contractor would do something like butcher conduits through a gutter. The rest of it is just too neat and proper.

[This message has been edited by Gus1999 (edited 02-07-2003).]

Page 1 of 2 1 2

Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
Tom
Tom
Shinnston, WV USA
Posts: 1,044
Joined: January 2001
Show All Member Profiles 
Top Posters(30 Days)
BigB 3
Popular Topics(Views)
248,669 Are you busy
186,403 Re: Forum
175,893 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.233s Queries: 15 (0.214s) Memory: 1.0252 MB (Peak: 1.2034 MB) Zlib enabled. Server Time: 2018-08-21 07:57:59 UTC