The first photo is of the "new" panel, a 6 circuit, 3R, MLO. Not nearly enough room for the mobile home, let alone the addition to said mobile home and the circuits required. It was replaced with a 22 space 100 A with Main CB
The second pic is a close-up showing the conductor shorted to the meter base frame
The third photo shows the cut neutral strands so the conductor would fit into the 100 Meter base that was here before the inspection and was "repaired" with a 200A before I came along.
Photo #4 shows the modified dead front for the 3R 200A Panel, very sharp and jagged too.
Photo #5 is another shot of the meterbase "before"...
The 6th photo is the after pic of the meterbase, just for comparison.
Not shown, open splices, cut cables, loose acorns on the ground rods, no back-fill on the conduit (and too shallow), no treated lumber, and snakes and bugs galore....
All this and a little yippy, biting dog...
-Virgil