ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Do we need grounding?
by gfretwell - 04/06/24 08:32 PM
UL 508A SPACING
by tortuga - 03/30/24 07:39 PM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
0 members (), 205 guests, and 28 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#112999 01/01/02 02:19 PM
Joined: Oct 2000
Posts: 3,682
Likes: 3
Admin Offline OP
Administrator
Member
[Linked Image]

[Linked Image]
Quote
Is this conduit system complete?

Nick

PS- This occupancy can be classified as a place of assembly when done.

Joined: Mar 2001
Posts: 2,056
R
Member
Nick,

Is that Greenfield just stuffed into the PVC?
Is the PVC supported?

Joined: Aug 2001
Posts: 599
N
Member
The flex is properly terminated into a FA but the entire run is not supported. The PVC is a violation due to this being a place of assembly. A funny side note is the core plans called for 1-4โ€. They ran 2-2โ€ and one is not usable. This is for a phone cable so I guess they figure you could just split it in half. [Linked Image]

Joined: Mar 2001
Posts: 2,056
R
Member
Was it shot down, or did it pass?

Joined: Dec 2000
Posts: 4,294
Member
Split the cable in half? (Well, they generally do say it's in "pairs") [Linked Image]

Nick, Is the PVC a violation if the column's going to be wrapped, or in part of a wall?
(Yes, it sure needs some straps)

Joined: Aug 2001
Posts: 599
N
Member
No it has not been accepted yet. It probably will though considering the picture in my other post was bought off yesterday.
In my opinion it is a violation of 518-4(a) and 518-4(c). (The paragraph before the FPN)
This column gets framed around and dry walled but it is open at the top to a plenum ceiling.
518-4(b) has me a little confused though. This building has a few 1 hour fire corridors and one two hour. Does that make it โ€œof fire rated construction?โ€

Oh! Also 347-8 and table 347-8

Joined: Feb 2002
Posts: 6
H
Junior Member
ok it must just be the resolution but what kinda fitting is that between the pvc and flex? from my veiw it looks like a normal pvc coupler but with flex glued in the top end. and were are they sellin straps these days? must be a war shortage or somethin.

Joined: Aug 2001
Posts: 599
N
Member
Yes, it is the resolution. To their credit it is a F.A with a flex connector screwed into it.
BTW. This was covered up never to be thought about again. It was addressed but never corrected. If I have to do work like this to compete, I'll do something else. [Linked Image]