ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
sec cable code conflict
by HotLine1. 11/19/18 02:34 PM
This anti-theist is priceless!!!
by Texas_Ranger. 11/17/18 02:15 PM
High current GFI vs regular GFCI
by Texas_Ranger. 11/17/18 02:07 PM
Single phase and what you call it.
by dsk. 11/12/18 11:10 AM
New in the Gallery:
What is this for?
Plug terminals
Who's Online Now
0 registered members (), 9 guests, and 24 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Save-a-Box #112983
12/30/01 06:41 PM
12/30/01 06:41 PM
Admin  Offline
OP
Administrator
Member
Joined: Oct 2000
Posts: 3,524
NY, USA
[Linked Image]
Quote
Somebody really put in a lot of labor to save material on this one.

- Electure (Scott)

Tools for Electricians:
Re: Save-a-Box #112984
12/31/01 06:30 AM
12/31/01 06:30 AM
S
sparky  Offline
Member
Joined: Oct 2000
Posts: 5,371
Scott,
personally, i would not do this. However, it does tickle that NEC lobe in my gray matter (not trying to be difficult here, really..) as to comparisson to this....
http://www.gen-tran.com/transfer.htm

Re: Save-a-Box #112985
12/31/01 01:29 PM
12/31/01 01:29 PM
electure  Offline

Member
Joined: Dec 2000
Posts: 4,276
Fullerton, CA USA
Steve,
Exactly

Re: Save-a-Box #112986
01/01/02 11:41 PM
01/01/02 11:41 PM
Z
Zalman  Offline
Junior Member
Joined: Jan 2002
Posts: 2
Berkeley, CA. USA
If it is clean and safe like this appears, I like it.


Zalman
Re: Save-a-Box #112987
01/02/02 10:25 AM
01/02/02 10:25 AM
M
mamills  Offline
Member
Joined: Nov 2001
Posts: 745
Wharton, Texas, USA
Is there anyone in the group who has done electrical maintenance work in a public assembly facility, such as a convention center? I remember seeing something such as this at a convention I attended some time ago. In the exhibit hall where numerous small booths were set up, there were portable load centers set up in this manner for distributing power from large-capacity floor receptacles (floor pockets) located at various points throughout the room. From these panels, smaller portable cables(I assume 12/3 or 10/3 SO cable or something of the like) carried different "circuits" to booths according to their electric requirements. The whole affair would be laid on the floor in an "alley" created by the booths being set up back to back. Looked like a reasonably safe way of temporarily distributing power. I would guess that the wiring inside the load center could be pretty tight due to the body of the receptacle being in there too.

Does anyone know of an NEC article that forbids (or regulates) this type of work?

Mike (mamills)

Re: Save-a-Box #112988
01/02/02 12:06 PM
01/02/02 12:06 PM
Joe Tedesco  Offline
Member
Joined: Oct 2000
Posts: 2,749
Boston, Massachusetts USA
See Section 518-3(b) This section in the 1999 NEC covers "Temporary Wiring" in a Place of Assembly.

[This message has been edited by Joe Tedesco (edited 01-02-2002).]


Joe Tedesco, NEC Consultant
Re: Save-a-Box #112989
01/03/02 08:30 PM
01/03/02 08:30 PM
electure  Offline

Member
Joined: Dec 2000
Posts: 4,276
Fullerton, CA USA
I don't think this is a violation per '99 Code, but in '02 - 406.4 "Receptacle Mounting. Receptacles shall be mounted in boxes or assemblies designed for the purpose, and such boxes or assemblies shall be securely fastened in place."
404.3 "Enclosure. (A)" Basically says the same for switches ("listed for the intended use").
This town's still going under '96 Code, so I guess it's OK.
but still, this guy used a die grinder on these holes...T&M maybe??


Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
HappyElectrician
HappyElectrician
Penn USA
Posts: 31
Joined: December 2011
Show All Member Profiles 
Top Posters(30 Days)
Admin 7
Popular Topics(Views)
251,620 Are you busy
188,753 Re: Forum
178,462 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.029s Queries: 14 (0.006s) Memory: 0.9854 MB (Peak: 1.1404 MB) Zlib enabled. Server Time: 2018-11-20 01:04:05 UTC