ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat Box
Recent Posts
Vibrator Supplies??
by gfretwell - 10/19/19 08:33 PM
FPE in Germany
by NORCAL - 10/16/19 08:24 AM
Help with aging employee advice.
by Bill Addiss - 10/15/19 10:58 PM
Fuse blower plug?
by gfretwell - 10/13/19 03:23 PM
Power factor and transformer efficiency
by TeslaEdison - 10/13/19 04:05 AM
New in the Gallery:
FPE Breaker panel in germany
What is this for?
Who's Online Now
0 registered members (), 11 guests, and 10 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Save-a-Box #112983 12/30/01 07:41 PM
Joined: Oct 2000
Posts: 3,587
Admin Offline OP
Administrator
Member
[Linked Image]
Quote
Somebody really put in a lot of labor to save material on this one.

- Electure (Scott)

Tools for Electricians:
Re: Save-a-Box #112984 12/31/01 07:30 AM
Joined: Oct 2000
Posts: 5,383
S
sparky Offline
Member
Scott,
personally, i would not do this. However, it does tickle that NEC lobe in my gray matter (not trying to be difficult here, really..) as to comparisson to this....
http://www.gen-tran.com/transfer.htm

Re: Save-a-Box #112985 12/31/01 02:29 PM
Joined: Dec 2000
Posts: 4,281
electure Online Sleepy
Member
Steve,
Exactly

Re: Save-a-Box #112986 01/02/02 12:41 AM
Joined: Jan 2002
Posts: 2
Z
Zalman Offline
Junior Member
If it is clean and safe like this appears, I like it.


Zalman
Re: Save-a-Box #112987 01/02/02 11:25 AM
Joined: Nov 2001
Posts: 745
M
mamills Offline
Member
Is there anyone in the group who has done electrical maintenance work in a public assembly facility, such as a convention center? I remember seeing something such as this at a convention I attended some time ago. In the exhibit hall where numerous small booths were set up, there were portable load centers set up in this manner for distributing power from large-capacity floor receptacles (floor pockets) located at various points throughout the room. From these panels, smaller portable cables(I assume 12/3 or 10/3 SO cable or something of the like) carried different "circuits" to booths according to their electric requirements. The whole affair would be laid on the floor in an "alley" created by the booths being set up back to back. Looked like a reasonably safe way of temporarily distributing power. I would guess that the wiring inside the load center could be pretty tight due to the body of the receptacle being in there too.

Does anyone know of an NEC article that forbids (or regulates) this type of work?

Mike (mamills)

Re: Save-a-Box #112988 01/02/02 01:06 PM
Joined: Oct 2000
Posts: 2,749
Joe Tedesco Offline
Member
See Section 518-3(b) This section in the 1999 NEC covers "Temporary Wiring" in a Place of Assembly.

[This message has been edited by Joe Tedesco (edited 01-02-2002).]


Joe Tedesco, NEC Consultant
Re: Save-a-Box #112989 01/03/02 09:30 PM
Joined: Dec 2000
Posts: 4,281
electure Online Sleepy
Member
I don't think this is a violation per '99 Code, but in '02 - 406.4 "Receptacle Mounting. Receptacles shall be mounted in boxes or assemblies designed for the purpose, and such boxes or assemblies shall be securely fastened in place."
404.3 "Enclosure. (A)" Basically says the same for switches ("listed for the intended use").
This town's still going under '96 Code, so I guess it's OK.
but still, this guy used a die grinder on these holes...T&M maybe??


Featured:

2020 National Electrical Code
2020 National Electrical
Code (NEC)

* * * * * * *

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
sbi
sbi
indiana
Posts: 47
Joined: March 2008
Show All Member Profiles 
Top Posters(30 Days)
sparky 10
Popular Topics(Views)
259,626 Are you busy
195,011 Re: Forum
184,422 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.7.3