ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
Single phase and what you call it.
by dsk. 11/12/18 11:10 AM
220/230/240V 60Hz Systems
by Albert. 11/07/18 12:48 AM
Black & Decker Recalls Hammer Drills
by Admin. 11/01/18 07:22 PM
Having around 30 projectors to dump
by gfretwell. 10/31/18 10:54 PM
Installing a small swimming pool
by TimothyHallam. 10/30/18 10:42 PM
New in the Gallery:
What is this for?
Plug terminals
Who's Online Now
0 registered members (), 33 guests, and 23 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Not in Scope.... Blind Leading Blind. #110782
06/22/06 06:02 PM
06/22/06 06:02 PM
electure  Offline
OP
Member
Joined: Dec 2000
Posts: 4,275
Fullerton, CA USA
From e57 (Mark Heller)

Quote
Went to check on (new) Lead Journeyman (Certified), who was given 2 known "rope-a-dopes" (Also certified) to do a 90% remodel. They have an Inspector on the way for rough, and want to see it before he gets there. I walk in and see the receptacle screwed to the rafters of an open ceiling in the attic, as soon as I walk in the door.... I look at some of the 1/2 baked work they did and call off the inspection. While tearing into the lead I ask about the receptical screwed to the rafter, his reply was "Not in scope of work..." I jump into the rafters myself and follow it back to find what fed it buryied in insulation.... I ask if they say it... Same reply!

Rope-a-dopes are gone, and Lead demoted to schmuck.


[Linked Image]

[Linked Image]


[Linked Image]


[Linked Image]


[This message has been edited by electure (edited 06-22-2006).]

2017 / 2014 NEC & Related Books and Study Guides
Re: Not in Scope.... Blind Leading Blind. #110783
06/22/06 08:02 PM
06/22/06 08:02 PM
T
trobb  Offline
Member
Joined: Jun 2006
Posts: 110
Iowa City, IA
Call me the new guy, but did they actually use K&T for NEW work? Shortcut to avoid new protection in the attic? Or just general stupidity?

Re: Not in Scope.... Blind Leading Blind. #110784
06/22/06 08:23 PM
06/22/06 08:23 PM
E
e57  Offline
Member
Joined: May 2003
Posts: 2,876
S.F.,CA USA
No K&T used for new work (Also garabage, but different story), but general policy is that if crapola like this is seen, put in a change order to correct... Add to scope, not embarass the company, and GC with correction notices, and additional inspections.

And to add a Correction: "I ask if they say it", should be "I ask if they've seen it"

"Rope-a-dopes" left because I told them and the Boss that they made too much money for the work they did. They took the hint and left, saving the trouble of finding a way to get rid of them, Schmuck is still employed due to lack of "Bodies".


Mark Heller
"Well - I oughta....." -Jackie Gleason
Re: Not in Scope.... Blind Leading Blind. #110785
06/23/06 10:08 AM
06/23/06 10:08 AM
B
Big Ed  Offline
Member
Joined: Apr 2004
Posts: 55
Roxboro, NC, USA
Any idea what the "tails" on the recept. are for?

I don't do residendial work, but I do understand that most people have the "the last ones to work on it get the blame for everything" mentality.

I do industrial, and we get the same thing.

Re: Not in Scope.... Blind Leading Blind. #110786
06/23/06 10:14 PM
06/23/06 10:14 PM
Scott35  Offline

Broom Pusher and
Member
Joined: Oct 2000
Posts: 2,708
Anaheim, CA. USA
Mark (E57):

Quote

Rope-a-dopes are gone, and Lead demoted to schmuck


LOL!!! [Linked Image]

ROTF, LMAO!!! [Linked Image]

Sorry you have to deal with Baloney like this from your Field Personnel, but that quoted text is just hilarious!!!

It's funny, because I have had to deal with similar afflictions, involving -
"Field Personnel Suffering From 'Heads Inserted Into Butt-Zone', Resulting In Extreme Dicketry" -
stuff, with almost exact results!

My "Fix" was to place the newly knighted "Schmuck Lead" with certain crews, lead by very knowledgeable - but extremely intolerant of any B.S. types, which normally would correct the "Schmuck Problem" after some time.

Scott35


Scott " 35 " Thompson
Just Say NO To Green Eggs And Ham!
Re: Not in Scope.... Blind Leading Blind. #110787
06/24/06 07:49 AM
06/24/06 07:49 AM
T
Texas_Ranger  Offline
Member
Joined: Dec 2001
Posts: 2,431
Vienna, Austria
But what's thee black& white K&T stuff? That doesn't look original either!

Re: Not in Scope.... Blind Leading Blind. #110788
06/24/06 11:25 AM
06/24/06 11:25 AM
A
Alan Nadon  Offline
Member
Joined: Mar 2005
Posts: 399
Elkhart, IN. USA
Like Big Ed says, The last guy to touch it gets blamed. If something bad happens the lawyers will be after you.
As the inspector I don't want to waste time in court as a witness.
As an inspector I can sometimes wear blinders when inspecting factories and try to limit what I see to what is currently being done but, even there gross violations get me an interview with the managers about getting additional work done or I shut the whole place down.
It works out when the electrician doesn't want to lose the customer, and the customer doesn't want to spend money but, the inspector makes them fix it.
Gross violations...Fix them, or sit in the dark looking at the red tag.
Sometimes you have to wear a rubber hat to get things done. [Linked Image]
Alan--


Alan--
If it was easy, anyone could do it.
Re: Not in Scope.... Blind Leading Blind. #110789
06/24/06 01:21 PM
06/24/06 01:21 PM
E
e57  Offline
Member
Joined: May 2003
Posts: 2,876
S.F.,CA USA
Texas_Ranger
K&T was done here clear until the sixties, in some instalations you'll find it done in thermoplastic insulation, like this one. The other crap installed on it looks like a mid-seventies hack job for attic power and lighting, there was a porcilin dangleing off it further down, that I made one of the "rope a dopes" remove.

BTW "rope a dope" comes from them THEMSELVES (Two brothers who came on together) after quizing them (and said - Be honest now) on how much experiance they had and reffering to themselves as just "Rope-Pullers", the other offered up the term "Rope-A-Dope".


Mark Heller
"Well - I oughta....." -Jackie Gleason
Re: Not in Scope.... Blind Leading Blind. #110790
06/25/06 04:34 AM
06/25/06 04:34 AM
T
Texas_Ranger  Offline
Member
Joined: Dec 2001
Posts: 2,431
Vienna, Austria
Quote
K&T was done here clear until the sixties, in some instalations you'll find it done in thermoplastic insulation, like this one. The other crap installed on it looks like a mid-seventies hack job for attic power and lighting, there was a porcilin dangleing off it further down, that I made one of the "rope a dopes" remove

Oh, that's interesting! I though K&T went out of favor around WWII.


Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
waymag
waymag
dallas, texas, USA
Posts: 68
Joined: January 2002
Show All Member Profiles 
Top Posters(30 Days)
Admin 8
dsk 3
Popular Topics(Views)
251,406 Are you busy
188,633 Re: Forum
178,337 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.037s Queries: 14 (0.005s) Memory: 1.0064 MB (Peak: 1.1699 MB) Zlib enabled. Server Time: 2018-11-13 16:06:05 UTC