ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
Cordless Tools: The Obvious Question
by renosteinke - 03/14/24 08:05 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
0 members (), 279 guests, and 15 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#108769 01/28/04 10:32 PM
Joined: Oct 2000
Posts: 3,682
Likes: 3
Admin Offline OP
Administrator
Member
[Linked Image]

[Linked Image]

[Linked Image]

[Linked Image]
Quote
i have here two 'occupied' unfinished places, one is a pool with bathing suits hung off xmas lights, the other a shower in use w/o the glass door & wall.

these were taken the same day, different jobs

~Steve aka sparky

Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

#108770 01/29/04 05:24 AM
Joined: Aug 2001
Posts: 7,520
P
Member
That switch/receptacle box seems rather close to the shower area for my liking, even if it is a GFI outlet.

The temporary light spliced into the fixture box (last pic, upper right) is a nice touch!

#108771 01/29/04 07:42 AM
Joined: Oct 2000
Posts: 5,392
S
Member
the sw/gfi location is to have a glass wall, the 3' rule will be met when it is installed.

my state (Vermont) does not have , for single family dwellings, occupancy permits.

so people tend to live with pigtails, or as situations seen here for indefinite periods of time...

where i stand as an EC here is worrisome,to energize or not energize is often the Q

~S~

#108772 01/29/04 01:05 PM
Joined: Aug 2002
Posts: 35
S
Member
Even if the GFCI trips the wires in the open box are still hot (the line side). Don't reach for that switch from the shower or it will be the last thing you do! [Linked Image]

SD


SD
It is best for a leader to be both feared and loved. But since this usually cannot be done, it is safer to be feared.
#108773 01/29/04 02:14 PM
Joined: Nov 2000
Posts: 246
R
Member
What 3' rule? There is no such rule for receptacles. See Section 406.8(C). Inside the space, sure, but where does the space end? 3' out? I don't think so. The bathtub and shower space stops at the end of the bathtub (or shower floor).

Rick Miell

#108774 01/29/04 06:54 PM
Joined: Oct 2000
Posts: 5,392
S
Member
Thank you Rick
i have obviously confused 550.13(F)here with a normal residency

#108775 02/25/04 03:01 AM
Joined: May 2003
Posts: 2,876
E
e57 Offline
Member
There used to be what was refered to as the "3' rule" for outlets near sinks and the like, to be GFI'ed. It may have been re-worded, or moved in the Code. It was pretty early in the GFI requirements. I'm sure that was what Sparky was refering to, as it read very simular to that other code in motor homes.

Now get this, where I'M at... ( S.F. CA - That's right, we publish our own Code Book here, welcome to the City. And all ten Inspectors interpit it differently. ) You can get hit by the AHJ for for "within reach of the tub", to be GFI'ed. This goes for line side of a switch, sconces or fixtures below 8', and of course, outlets. ( You'll only get hit on it if it's really obvious. ) After dealing with some "San Fiasco's", you get frustrated. So, I go through this everytime I do a switch, or light near a tub. I say to myself, " F%#*, GFI the WHOLE Bathroom. At the Breakers!"

Here's another good example of a "San Fiasco":

120/240 volt 3-phase delta circuits - “A” phase black, “B” (high leg) phase PURPLE, “C” phase red;


[This message has been edited by e57 (edited 02-25-2004).]


Mark Heller
"Well - I oughta....." -Jackie Gleason
#108776 02/25/04 06:19 PM
Joined: Jan 2002
Posts: 1,457
E
Member
Who cuts the cover plate for the switch/ receptacle?


Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5