ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Increasing demand factors in residential
by gfretwell - 03/28/24 12:43 AM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
Cordless Tools: The Obvious Question
by renosteinke - 03/14/24 08:05 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (gfretwell), 32 guests, and 14 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 3 of 3 1 2 3
#107343 10/10/04 01:56 PM
Joined: Jun 2003
Posts: 1,143
D
Member
Purty job, Dave!

I like the way nylocks (ty-wraps)look for new panels, but agree as a remodel guy they can be a pain.

It's still better than the average rat's nest of wire we all see.

Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

#107344 10/10/04 02:01 PM
Joined: Dec 2003
Posts: 59
B
Member
nice looking job

#107345 10/11/04 08:57 PM
Joined: May 2004
Posts: 697
D
Member
We go by the NEC here regarding wire colors. My generous use of wire ties comes from my background in wiring machine controls. I used stranded wire on this job which doesn't stay put very well. I also do a lot of remodeling and could remove all these ties in a minute.

Dave

P.S. Some final comments before we let this thread die are:

I used a 2" nipple even though it's only 100-amp in case it got changed out later to a 200-amp service, which are getting more common here. I used duct seal in the nipple after taking this picture.

I plugged the four mounting holes with fender washers even though the holes aren't quite as large as a 1/2" knockout.

#107346 10/12/04 09:47 AM
Joined: Nov 2002
Posts: 558
G
Member
Nice looking job Dave. [Linked Image]


Russell

#107347 10/15/04 12:30 AM
Joined: Aug 2003
Posts: 57
Member
Looks good! I like seeing 'before' and 'after' pics of just about anything. Amazing. This really looks better. [Linked Image]


"Live the dream, you only get one chance."
#107348 10/15/04 10:51 AM
Joined: Nov 2001
Posts: 745
M
Member
Dave: I'll agree; it is a very nice looking job. More installs should look this good!

I'm interested in the construction of the service to the meter outside, since I have never seen such an install in my part of the country. With the bottom end of the raceway buried below ground level (and in contact with the ground), what do think it's life expectancy will be? Also, Is there somewhere a transition from UG conduit to this raceway, and where does it take place? Just curious...

Mike (mamills)

#107349 10/15/04 12:27 PM
Joined: May 2004
Posts: 697
D
Member
This is a typical installation around here, Mike. The service is underground and the POCO brings in a triplex (direct burial) into this pedestal type meter-socket. This meter-socket is essentially back-to-back with the distribution panel in the attached garage. A more typical installation in this area would probably be into a full basement, where you would need a 90 degree sweep into the distribution panel. Often the services are overhead rather than underground.

Dave

(edit) PS I've dug up these pedestal type meter-sockets that were installed 30-40 years ago and they're still in good shape. The paint may not look good, but there are no holes in the metal.

[This message has been edited by Dave55 (edited 10-15-2004).]

Page 3 of 3 1 2 3

Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5