Interesting how they were so proud of the way in which the splices were made.
No insulated bushings, what's wire bending space, and the size of the box!
I like the total weight for the scrap for the 10 stories (I was told) and what it brought to the till for the people who pulled this stuff out.
PS:MCM is now Kcmil
![[Linked Image]](https://www.electrical-contractor.net/jt/old2.JPG)