ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals

>> Home   >> Electrical-Photos   >> Classifieds   >> Subscribe to Newsletter   >> Store  
 

Photo of the Week:

Joe T's Hall of Shame
Joe T's Hall of Shame

Advertisement:-Left
Recent Gallery Topics:
What in Tarnation?
What in Tarnation?
by timmp, September 10
Plumber meets Electrician
Plumber meets Electrician
by timmp, September 10
Who's Online Now
0 members (), 105 guests, and 43 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 1 of 2 1 2
Joined: Oct 2000
Posts: 2,749
Member
Was this encasement really necessary?

[Linked Image]


Joe Tedesco, NEC Consultant
Horizontal Ad
Joined: Jan 2003
Posts: 4,391
I
Moderator
IMO overkill for this short distance, but given the wording of the NEC I believe the inspector can require this.

I have done this to get about 40' to 60' inside of buildings.

Bob

FWIW I hope there are some dowels into the foundation to carry the weight of this. [Linked Image]


Bob Badger
Construction & Maintenance Electrician
Massachusetts
Joined: Dec 2000
Posts: 4,295
Member
Does this make it "outside the building"?

Joined: Nov 2003
Posts: 269
E
Member
Looks like it meets 230.6(2)from here. Cant tell if it is 2" all the way around though.


John
Joined: Jun 2003
Posts: 681
P
Member
Picture a 15 inch soffit overhang for the roof of a house. Now picture the RMC raceway for a mast run up the side of the house and throught the soffit and in the void up through the roof. There was about 15 inches of RMC in the space. The inspector made the contractor incase that portion in 2 inches of concrete, as he said it was inside the house....HMMMM

Pierre


Pierre Belarge
Joined: May 2003
Posts: 2,876
E
e57 Offline
Member
Now picture this... A guy shows up to do demo for a remodel. Sees a 6"X6" concrete column (somewhere outside of this panel room) and thinks to himself... Well it's non-structural, what's it for... Jackhammer, or Diamond saw? Boom!

If it were just the conduit, they would call an Electrician, right?

Just so happens, I had to call the Inspector for 230.70A today, we get a different answer everytime! Today, they said they'll get back to me... I have a job where we'll need to go 38' into the building.


Mark Heller
"Well - I oughta....." -Jackie Gleason
Joined: Jan 2002
Posts: 1,457
E
Member
The picture also seems to me to be overkill. Is this the only portion in the building? Is the other side of that wall outdoors or another part of the building that the pipe goes through?
E57 I don't see how there could even be a question for 38' inside the building.

Horizontal Ad
Joined: May 2003
Posts: 2,876
E
e57 Offline
Member
No other place to enter building, no other place for service, 38' to get there... (22' back 16' down, all service drops)

Cusomer is building the Taj Mahal, no kidding turrets and onion domes. Boss wants exposed, customer is taking a hissy fit about a 2" pipe running all over his palace. We'll let the inspector make the call...

230.70A is left pretty much up to the inspector.

Personal thought its that it needs to be clarified!

In the past they've OK'ed it! Sometimes they don't... I'm still pushing for under-ground from the pole. But PG&E takes about 18 months to connect! The Inspector hasn't called me back yet. Let you know what he says...

[This message has been edited by e57 (edited 07-14-2004).]


Mark Heller
"Well - I oughta....." -Jackie Gleason
Joined: Jan 2003
Posts: 4,391
I
Moderator
E, I can not imagine going 38' into the building without encasement. There is no chance that would be allowed here.

As far as demo guys cutting into it that can always be a problem.

I had to help repair a 4" conduit that was cut by a concrete saw, it was one of eight sets of 600 kcmils that feed a 3000 amp 480 switch gear.

The operator of the saw was OK but it knocked out a neighborhood.


Bob Badger
Construction & Maintenance Electrician
Massachusetts
Joined: Jul 2004
Posts: 625
S
Member
Dumb question from someone not privy to the sausage-making, err, code-making process: What's the point of the encasement? I can't see how RMC by itself would be measurably less safe than RMC encased in concrete. In theory, sure, anything in 2" of concrete is more protected than the same thing without the concrete. But, in practice, RMC is practically indestructible, absent a structural collapse or vehicle impact.

Page 1 of 2 1 2

Link Copied to Clipboard
Advertisement:-Right


Tools for Electricians
Tools for Electricians
 

* * * * * * *
2023 National Electrical Code (NEC)
2023 NEC + Exam Prep Study Guides Now Available!
 

Member Spotlight
Niko
Niko
Campbell, CA
Posts: 356
Joined: August 2006
Top Posters(30 Days)
dsk 1
Popular Topics(Views)
338,407 Are you busy
263,822 Re: Forum
244,153 Need opinion
New Page 2
Powered by UBB.threads™ PHP Forum Software 7.7.5