ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
MRI LED lights dimmer control replacement - wow!
by Potseal. 01/18/18 10:41 PM
Video: Inventor of the GFCI self-testing shocks
by Bill Addiss. 01/17/18 11:11 PM
FPE in Germany
by HotLine1. 01/17/18 07:07 PM
VDE 0100 to introduce AFCIs
by LongRunner. 01/17/18 10:32 AM
Fujifilm Recalls Power Adapter Wall Plugs
by Admin. 01/16/18 07:04 PM
New in the Gallery:
Housebilding DIY wiring
SE cable question
Who's Online Now
0 registered members (), 10 guests, and 14 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Wiring of Sprikler Flow Switches #102714
09/19/06 10:10 AM
09/19/06 10:10 AM
M
mikesh  Offline OP
Member
Joined: Jun 2006
Posts: 613
Victoria, BC, Canada
CAN/ULC-S524-01
Rule 3.4.11 states Wiring from sprinklerwater flow devices and supervisory devices, housed in a water (weather) tight enclosure, shall be of a type suitable for "wet locations".

Lately we have been getting verification reports stating that the wiring to flow switches is not weatherproof even when the sprinkler valves are in a dry location. I had always wired according to the location and not used weatherproof wiring method like sealtite but dry flex or FAS armoured cable.

Anyone else noticed this, or getting called. The Building Inspectors want a clean verification report and we want to see they get it but this seems like overkill when the wiring method for the sprinkler room is BX or Loomex.

Tools for Electricians:
Re: Wiring of Sprikler Flow Switches #102715
09/21/06 08:59 PM
09/21/06 08:59 PM
J
jay8  Offline
Member
Joined: Jul 2005
Posts: 183
Vancouver, BC
Never had this come back as a deficiency on verification. It seems like the default enclosure for all sprinkler junction boxes are for wet location, never seen one that wasnt - whether low air, tamper or flow. Who has been doing the verifications on the installations in question? I would guess most of the sprinkler rooms in the province do not comply with the ULC S524 rule you quoted.


Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
Theelectrikid
Theelectrikid
Levittown, PA
Posts: 810
Joined: April 2004
Show All Member Profiles 
Top Posters(30 Days)
Admin 20
sparky 18
Potseal 14
Popular Topics(Views)
243,546 Are you busy
180,351 Re: Forum
170,832 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.010s Queries: 14 (0.003s) Memory: 0.9423 MB (Peak: 1.0543 MB) Zlib enabled. Server Time: 2018-01-19 09:51:48 UTC