ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
Changing a Bulb
by gfretwell. 07/14/18 03:12 PM
Tray cable?
by gfretwell. 07/11/18 10:18 PM
Eaton Heavy Duty 30A and 60A Safety Switches
by Admin. 07/11/18 09:49 PM
ORTOVOX Recalls Avalanche Transceivers
by Admin. 07/11/18 09:44 PM
Tingle off the water spigot
by gfretwell. 07/08/18 12:58 PM
New in the Gallery:
Plug terminals
Housebilding DIY wiring
Who's Online Now
0 registered members (), 33 guests, and 17 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
suspended ceiling #100264
11/06/06 09:22 PM
11/06/06 09:22 PM
B
BigB  Offline OP
Member
Joined: Mar 2004
Posts: 725
Tucson, AZ USA
A projector is mounted from the suspended ceiling in a retail store. It is mounted to a 1-1/2 PVC pipe which is secured to the building at a point above the ceiling grid. The PVC has grommeted holes below the grid and above to pass wires thru. The power cord is passed thru the pipe into the area above the grid, where it is plugged into a duplex mounted above the ceiling. The area above the grid is not used for an air plenum. Would this installation meet code?

2017 / 2014 NEC & Related Books and Study Guides
Re: suspended ceiling #100265
11/06/06 09:40 PM
11/06/06 09:40 PM
renosteinke  Offline
Cat Servant
Member
Joined: Jan 2005
Posts: 5,316
Blue Collar Country
Nope. Code has no exceptions for flexible cords above any kind of suspended ceiling.

FWIW, I had a similar job. I ran MC to a box, that was mounted to a piece of plywood that substituted for a ceiling tile. This box was used to mount a receptacle, which is where the projector got it's power.

Re: suspended ceiling #100266
11/07/06 08:06 AM
11/07/06 08:06 AM
electure  Offline

Member
Joined: Dec 2000
Posts: 4,271
Fullerton, CA USA
An easy fix--- mount a receptacle facing down in the ceiling with one of these: 512
Use a 3/4" deep mud ring, and you're in [Linked Image]

Re: suspended ceiling #100267
11/07/06 11:26 AM
11/07/06 11:26 AM
I
iwire  Offline
Moderator
Joined: Jan 2003
Posts: 4,391
North Attleboro, MA USA
I agree with Reno and electure.

No cords in the ceiling.


Bob Badger
Construction & Maintenance Electrician
Massachusetts
Re: suspended ceiling #100268
11/07/06 02:06 PM
11/07/06 02:06 PM
H
Helectric  Offline
Member
Joined: Jan 2005
Posts: 90
Brandon, SD
Shouldn't questions regarding code compliance in this case end with the placement of the receptacle?

Is the projector cord considered "building wiring" and if not then is it subject to code rules?

(edited for grammer)

[This message has been edited by Helectric (edited 11-07-2006).]

Re: suspended ceiling #100269
11/07/06 03:15 PM
11/07/06 03:15 PM
T
trobb  Offline
Member
Joined: Jun 2006
Posts: 110
Iowa City, IA
(I assume this building passed inspection) The school I am in has this same setup. They use a 2x2 metal pan designed specifically for projectors. There is a pipe for the projector, a 2x4 KO for a duplex, and a grommeted area for the A/V cables. Just a guess, but it might be that the A/V cables are treated as network cables- they need to be rated if inside a plenum.

Re: suspended ceiling #100270
11/07/06 06:30 PM
11/07/06 06:30 PM
I
iwire  Offline
Moderator
Joined: Jan 2003
Posts: 4,391
North Attleboro, MA USA
Quote
Is the projector cord considered "building wiring" and if not then is it subject to code rules?


Interesting, but the NEC for good or bad has extended itself past the receptacles.

Here are a few 2005 NEC examples to look at

590.5

422.51

440.65

240.5


Bob Badger
Construction & Maintenance Electrician
Massachusetts
Re: suspended ceiling #100271
11/07/06 09:11 PM
11/07/06 09:11 PM
electure  Offline

Member
Joined: Dec 2000
Posts: 4,271
Fullerton, CA USA
Something else to take into consideration is the age of the installation.
I think this prohibition was added in the '99 NEC (no book with me). If it was installed previous to that Code's adoption, it could very well have been inspected, and code compliant.

Not everything that doesn't meet the latest Code is a violation [Linked Image]

Re: suspended ceiling #100272
11/07/06 09:27 PM
11/07/06 09:27 PM
B
BigB  Offline OP
Member
Joined: Mar 2004
Posts: 725
Tucson, AZ USA
The present installation is an extension cord run across the top of the grid to a wall, where it is poked thru to a wall duplex. The fire inspector said they have to change it, and said it would be ok set up the way I described it in my original post. Now I will have to tell them no matter what the fire inspector says, I can only do it to code. Thanks for the help everyone.


Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
HappyElectrician
HappyElectrician
Penn USA
Posts: 31
Joined: December 2011
Show All Member Profiles 
Top Posters(30 Days)
Admin 5
Popular Topics(Views)
248,133 Are you busy
185,587 Re: Forum
174,923 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.021s Queries: 14 (0.004s) Memory: 1.0027 MB (Peak: 1.1729 MB) Zlib enabled. Server Time: 2018-07-19 19:13:48 UTC