Our state just changed the requirements for fuel dispensing about two months ago.

Before, it was required to be RMC the whole way. Now ten feet after the trough seal off has to be rigid and EPVC to the pumps and tank monitors except for the last ten feet which changes back to rigid with another seal off. We bond with EGC at both ends.

A lot easier to run and a lot easier on the pocket.