I was thinking about putting pipe dope on the last 1/4" of threads on some 1/2 rigid pipe going in the ground. My thinking was that this will help keep water out making the installation last longer.
Do you think this would be in violation of 250.4 or other code. The rmc still has continuity, especially since the sealant is only on the ends of the threads. I will also be pulling in a ground wire.


Jesus may have been a capenter,but God was an electrician.Genesis1:3