I'm bidding a job at a horse barn that will require me to run EMT. I do mostly resi. work with romex and was wondering how most of you would bid such a job. I normally bid my resi. work by the sq.ft. Is there such a way of bidding a pipe job? Or should I count all of the openings, add up how many lengths of pipe, etc.?
HELP!!!