Situation: (Residential 120/240v)

Service Entrance cable and Meterpan must be replaced and relocated. It is 100A with a 100A MB panelboard inside. Customer would like to upgrade to 200 but doesn't have the $$ to do the whole job right now.

Question:
The SE cable and meterpan will be replaced with 2/0 and 200A Meterpan now and will continue to feed the 100A MB panelboard until that will be upgraded to 200A. Are there any concerns with doing this? Increased fault current levels?
(Service is overhead with #4 triplex Alum drop from pole)

Bill

[This message has been edited by Bill Addiss (edited 07-30-2001).]


Bill