Aldav53,
I am also an electrical contractor in the phoenix metro area. Mesa, AZ to be exact. I can usually make a profit if I charge $1,300.00 for a 200-amp panel up grade. That is if SRP and the city inspection pass the first time and get the meter put on that same day.

I have found that I am on the low side. I am currently putting up two 100-amp panel-meter combos side by side on a rental unit in phoenix. My proposal was at $2,300.00. So I have learned to charge a little more because that what the market can bear. My material so far is only at around $500.00. And my two guys spent eight hours each for a total out of pocket cost of $795.00. And I am charging $2,300.00 because I know I can.

Pretty Cool Ahe.