18,850 sq foot building with 12 units. 120/240v single phase. Cant get three phase. This is the base building with future buildouts to come at later dates. There will be 12 ac units drawing a max of 30 amps each. 12 120v 15 amp electric water heaters and small 120v furnaces. 12 exit lights and 24 em lights. 40 outside soffit cans with 120v 60 watt bulbs. the rest of the building is build out as they are sold. I dont know how to figure the rest of the genaral lighting and recptical load for power company. Is there a standard I should use for not knowing the futrue build outs. The spaces will all be professional type use (doctors, lawyers , office space)