The control room of my research cehmistry plant has a lab and an office above it. The office is no longer used, so we want to re-locatesome of our electrical equipment, such as a UPS, and a dozen or so VFDs to the room.
The rooms are block construction with concrete floor separating them from the control room and pre-cast concrete ceilings. There is drywall separating the office from the lab.
What questions, if any should be asked prior to installing the equipment in what was previously an office space.