If we're going to be civil here, I'd like to take the opportunity to get a small sampling of the "flatrate" price schedule. For example, what would be the cost of replacing a 20' section of deteriorated SE cable from the taps to the meter? How about the installation of a ceiling fan with full attic access and fishing a switch leg to the existing box that has adequate volume?