A good way?

How about snaking some new wires into the pole base along with the existing light feed.

Or as John has said pipe up the side of the base, if I had to do that it would certainly be done with schedule 80 RMC and a lot of high quality supports.



[This message has been edited by iwire (edited 06-06-2004).]


Bob Badger
Construction & Maintenance Electrician
Massachusetts