Quote
Here are a couple of pictures of panels that are existing to the building, but the EC is using for temporary power. As an inspector, I would not permit this. During my inspection, I would tell them the correction had to be made IMMEDIATELY. I would give them a couple of hours, and I would come back to check this. It has been the normal routine in this area and now we are trying to stop this method. It is starting to occur.

Pierre Belarge


[Linked Image]


[Linked Image]