[Linked Image]

This is a "C Conduit Body" and the cable connector was added. That violates the code, and splices in a conduit body are allowed only when the cubic inch capacity is maked on it.

The termination of the green EGC is not acceptable.


Joe Tedesco, NEC Consultant