#97680 - 03/14/06 08:18 AM lighting question
kyelectric Offline
Member
Registered: 08/30/05
Posts: 64
I would like to come directly out of the breaker panel and into 3 overhead lights first and then send 1 piece of romex out to the switch. I can't make this work on paper without running 12/3 between the individual light fixtures. Is there any way to do this using only 12/2? The switch is far away from the panel and the lights. To avoid running a long piece of romex all the way to the switch first and then all the way back to the lights, I was hoping to somehow go to the lights first and send only 1 long piece of romex out to the switch to break the circuit. Any ideas???
Thanks!
Top
2017 / 2014 NEC & Related Books and Study Guides
#97681 - 03/14/06 09:06 AM Re: lighting question
Tom Offline
Member
Registered: 01/01/01
Posts: 1044
Loc: Shinnston, WV USA
There is no way to do this with 12-2 that would meet code requirements. 12-3 is probably going to be the most cost effective method. You could check into an x-10 relay that is controlled by a small radio transmitter similar to a garage door opener.

Good luck

Tom
_________________________
Few things are harder to put up with than the annoyance of a good example.
Top
#97682 - 03/14/06 10:03 AM Re: lighting question
dannynova Offline
Member
Registered: 12/22/03
Posts: 18
Loc: new york
out of the panel to a splice box. out of the box to the switch and out of the box to the lights. this way one cable to the switch will be the hot/switch leg.
Top
#97683 - 03/14/06 10:15 AM Re: lighting question
gfretwell Offline


Member
Registered: 07/20/04
Posts: 9038
Loc: Estero,Fl,usa
Danny is on the right track. You could also split out your switch leg from the first luminaire in the string.
_________________________
Greg Fretwell
Top
#97684 - 03/14/06 06:59 PM Re: lighting question
kyelectric Offline
Member
Registered: 08/30/05
Posts: 64
I guess I just need to bite the bullet and run the feed to the switch first. No big deal, I was just trying to find an easier way to do this and save from running all the way down to the switch and back. If it was just one light, it would be no problem but I guess when you get more than 1 fixture it gets a little more complicated. Thanks for the replies!
Top
#97685 - 03/14/06 07:17 PM Re: lighting question
HLCbuild Offline
Member
Registered: 12/05/04
Posts: 209
Loc: Herndon,Va USA
KY,

As gfretwell said, run your feed to the first light, run a dead-end 2-wire switchleg from there to a switch. Down on white (reidentified) and back on black. Then tie into the lights.
Top

Member Spotlight
Member Since: 04/03/02
Posts: 6776
New in the Gallery:
SE cable question
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box


Who's Online
0 registered (), 44 Guests and 9 Spiders online.
Key: Admin, Global Mod, Mod
 
New in the Gallery:
SE cable question
 
Top Posters (30 Days)
Admin 51
HotLine1 43
gfretwell 17
Trumpy 16
Ruben Rocha 13
 
Newest Members
clee512, Jdscott2005, FAIZAN, Regitest2, sureshazhagai

ECN Electrical Forums - sponsored by Electrical Contractor Network - Electrical and Code Related Discussion for Electrical Contractors, Electricians, Inspectors, Instructors, Engineers and other related Professionals