The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!


2017 NEC and Related
2017 NEC
Now Available!

Recent Posts
Parking lot pole light swap....
by ghost307
Today at 04:10 PM
International Wire Colour Codes
by Tjia1981
Today at 12:08 PM
Son of Sparky
by HotLine1
10/20/16 07:43 PM
Speaking of Plugmold ...
by gfretwell
10/17/16 02:37 PM
Broken battery charger? Check for cobwebs!
by gfretwell
10/17/16 02:30 PM
New in the Gallery:
12.5A through 0.75mm˛ flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 12
HotLine1 7
ghost307 6
renosteinke 6
Potseal 4
Who's Online
1 registered (HotLine1), 162 Guests and 4 Spiders online.
Key: Admin, Global Mod, Mod
Topic Options
Rate This Topic
#97680 - 03/14/06 08:18 AM lighting question
kyelectric Offline

Registered: 08/30/05
Posts: 64
I would like to come directly out of the breaker panel and into 3 overhead lights first and then send 1 piece of romex out to the switch. I can't make this work on paper without running 12/3 between the individual light fixtures. Is there any way to do this using only 12/2? The switch is far away from the panel and the lights. To avoid running a long piece of romex all the way to the switch first and then all the way back to the lights, I was hoping to somehow go to the lights first and send only 1 long piece of romex out to the switch to break the circuit. Any ideas???

2014 / 2011 NEC & Related Books and Study Guides
#97681 - 03/14/06 09:06 AM Re: lighting question
Tom Offline

Registered: 01/01/01
Posts: 1069
Loc: Shinnston, WV USA
There is no way to do this with 12-2 that would meet code requirements. 12-3 is probably going to be the most cost effective method. You could check into an x-10 relay that is controlled by a small radio transmitter similar to a garage door opener.

Good luck

Few things are harder to put up with than the annoyance of a good example.

#97682 - 03/14/06 10:03 AM Re: lighting question
dannynova Offline

Registered: 12/22/03
Posts: 18
Loc: new york
out of the panel to a splice box. out of the box to the switch and out of the box to the lights. this way one cable to the switch will be the hot/switch leg.

#97683 - 03/14/06 10:15 AM Re: lighting question
gfretwell Offline


Registered: 07/20/04
Posts: 9024
Loc: Estero,Fl,usa
Danny is on the right track. You could also split out your switch leg from the first luminaire in the string.
Greg Fretwell

#97684 - 03/14/06 06:59 PM Re: lighting question
kyelectric Offline

Registered: 08/30/05
Posts: 64
I guess I just need to bite the bullet and run the feed to the switch first. No big deal, I was just trying to find an easier way to do this and save from running all the way down to the switch and back. If it was just one light, it would be no problem but I guess when you get more than 1 fixture it gets a little more complicated. Thanks for the replies!

#97685 - 03/14/06 07:17 PM Re: lighting question
HLCbuild Offline

Registered: 12/05/04
Posts: 206
Loc: Herndon,Va USA

As gfretwell said, run your feed to the first light, run a dead-end 2-wire switchleg from there to a switch. Down on white (reidentified) and back on black. Then tie into the lights.