The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!

Featured:
   

2017 NEC and Related
2017 NEC
Now Available!

   
Recent Posts
Industrail Control Panel bonding per 409.108
by sparkyinak
Yesterday at 06:29 PM
Calling all Non-US members!! (Non-US only)
by aussie240
12/07/16 02:39 AM
Photo Upload Tutorial
by DanK
12/06/16 11:35 PM
Sprinklered equipment 26-008
by bigpapa
12/02/16 04:24 PM
On Delay Relay with Auto Reset
by Potseal
12/01/16 09:59 AM
New in the Gallery:
12.5A through 0.75mm˛ flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 13
HotLine1 10
Texas_Ranger 8
sparkyinak 8
Potseal 6
Who's Online
2 registered (crselectric, mbhydro), 232 Guests and 4 Spiders online.
Key: Admin, Global Mod, Mod
Topic Options
Rate This Topic
#97636 - 03/09/06 08:28 PM table 300.5
ngoody24 Offline
Member

Registered: 09/25/05
Posts: 34
Loc: pace,FL, United States
Has this table changed between 2002-2005? I've been using Stallcup's Master study guide and a question has me stumped. Here is the question "Rigid metal conduit should be buried in the ground at a minimum of __ inches?"

A)4 B)6 C)12 D)18

I am coming up with an answer different than what the study guide says I should get using this table. I am using a 2002 code book,but a 2005 study guide.

Thanks

Nathan

Top
2014 / 2011 NEC & Related Books and Study Guides
#97637 - 03/09/06 08:51 PM Re: table 300.5
gfretwell Offline

Member

Registered: 07/20/04
Posts: 9045
Loc: Estero,Fl,usa
6"?
_________________________
Greg Fretwell

Top
#97638 - 03/09/06 08:58 PM Re: table 300.5
ngoody24 Offline
Member

Registered: 09/25/05
Posts: 34
Loc: pace,FL, United States
my answer was 4" so is the 2005 table different than the 2002 table?

Top
#97639 - 03/10/06 02:55 AM Re: table 300.5
Tiger Offline
Member

Registered: 05/04/05
Posts: 714
Loc: Crystal Lake, IL USA
ngoody 24

Table 300.5 is the same (2002 & 2005) in Column 2 (RMC & IMC).

All locations not specified below...6".

Dave

Top
#97640 - 03/10/06 05:17 PM Re: table 300.5
ShockMe77 Offline
Member

Registered: 06/11/05
Posts: 823
Loc: Rahway, New Jersey
That's one of the nice things about using rigid - not having to dig as deep!

Top
#97641 - 03/11/06 05:07 AM Re: table 300.5
electure Offline

Member

Registered: 12/24/00
Posts: 4226
Loc: Fullerton, CA USA
The 6" cover requirement was first called out in the '71 or '75 NEC, and hasn't changed since.

Top
#97642 - 03/11/06 07:31 AM Re: table 300.5
renosteinke Offline
Cat Servant
Member

Registered: 01/22/05
Posts: 5305
Loc: Blue Collar Country
The fine print of the code aside, I like things DEEP. For me, this means a minimum of being a coupl incehs deeper than the bottom of a slab, and deeper than the blade of a shovel (about 12").

Why? Because I don't want the pipe hit every time the gardner plants a flower or fixes a leaky irrigation pipe. I don't want the slab to act like "the worlds' dullest scissors" where the pipe exits. And I don't want the pipe cut when the plumber has to open up the slab to replace a drain.

Top
#97643 - 03/11/06 08:41 AM Re: table 300.5
gfretwell Offline

Member

Registered: 07/20/04
Posts: 9045
Loc: Estero,Fl,usa
Good point about the plumber. Rigid is tough stuff but no match for a 14" chop saw.