The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!

Featured:
   

2017 NEC and Related
2017 NEC
Now Available!

   
Recent Posts
Sprinklered equipment 26-008
by bigpapa
Today at 04:24 PM
On Delay Relay with Auto Reset
by Potseal
Yesterday at 09:59 AM
Wow, that was close!
by jraef
11/28/16 07:06 PM
Earthquake in New Zeeland
by RODALCO
11/27/16 11:25 PM
Calling all Non-US members!! (Non-US only)
by Tjia1981
11/27/16 06:33 AM
New in the Gallery:
12.5A through 0.75mm˛ flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 15
HotLine1 10
Texas_Ranger 8
Trumpy 8
sparkyinak 7
Who's Online
0 registered (), 202 Guests and 7 Spiders online.
Key: Admin, Global Mod, Mod
Page 1 of 2 1 2 >
Topic Options
Rate This Topic
#96018 - 10/31/05 03:38 AM Panel -Juction Box
shortcircuit Offline
Member

Registered: 06/27/04
Posts: 608
Loc: massachusetts
Can I use the old 100 amp, 20 circuit main panel as a juction box on a 200amp service upgrade where I will be changing the location of the panel?

I'm moving the panel 4 feet to get the needed working clearance. I'll strip out the guts of the panelboard.

I know I've seen this done before. I want to know if it is code compliant?

shortcircuit

Top
2014 / 2011 NEC & Related Books and Study Guides
#96019 - 10/31/05 04:30 AM Re: Panel -Juction Box
Tiger Offline
Member

Registered: 05/04/05
Posts: 714
Loc: Crystal Lake, IL USA
It is a box designed for electrical wiring. I consider it OK as long as you can't open the cover by the hinges, and that you consider derating if you run all the circuits in one large conduit between the two.

Sometimes it's a more attractive installation to have some 4X4 junction boxes over the old panel for the short wires, and pull the long ones into the new panel.

Dave

Top
#96020 - 10/31/05 04:03 PM Re: Panel -Juction Box
electure Offline

Member

Registered: 12/24/00
Posts: 4226
Loc: Fullerton, CA USA
Why can't you open the old panel by its hinges?

Top
#96021 - 10/31/05 05:37 PM Re: Panel -Juction Box
e57 Offline
Member

Registered: 05/27/03
Posts: 2837
Loc: S.F.,CA USA
Many inpspectors here will allow a panel to be used as only if you screw the door shut, so wiring isn't exposed throught the breaker KO's. They won't accept breaker KO'seals/blanks as many easily fall out. Some will go as far as to have you write on the panel (Now j-box), "No breakers or fuses inside."
_________________________
Mark Heller
"Well - I oughta....." -Jackie Gleason

Top
#96022 - 10/31/05 06:01 PM Re: Panel -Juction Box
gfretwell Offline

Member

Registered: 07/20/04
Posts: 9045
Loc: Estero,Fl,usa
If you could come up with a blank cover for the cabinet it isn't a breaker box anymore.
That would be a cleaner installation.
_________________________
Greg Fretwell

Top
#96023 - 11/02/05 03:08 AM Re: Panel -Juction Box
electure Offline

Member

Registered: 12/24/00
Posts: 4226
Loc: Fullerton, CA USA
Then would that leave a hinge-cover wireway or gutter in the same boat?
I can understand this in the case of a panel that doesn't have any door on it.
The marking is a good idea, and I've screwed many of the doors shut myself.
I just didn't understand the logic behind its being a requirement.
Thanks

Top
#96024 - 11/02/05 08:47 AM Re: Panel -Juction Box
macmikeman Offline
Member

Registered: 07/16/02
Posts: 718
Loc: Honolulu, Hawaii
I have been reading the code book for 30 years and haven't yet found any requirement to screw the cover shut when turning it into a j-box. Now you could find lots of codes that pertain to other things that could be redily misaplied to this such as listing requirements and protection from physical damage, etc, but it realy is not prohibited in any way.

Top
#96025 - 11/02/05 12:45 PM Re: Panel -Juction Box
Tiger Offline
Member

Registered: 05/04/05
Posts: 714
Loc: Crystal Lake, IL USA
I don't think it's much of a stretch to consider the gaping hole left by the absence of breakers an "unused opening".

Then Article 110.12 (A) would apply.

Dave

Top
#96026 - 11/02/05 01:40 PM Re: Panel -Juction Box
Larry Fine Offline
Member

Registered: 02/18/05
Posts: 684
Loc: Richmond, VA
It's interesting that breaker blanks are acceptable when the panel's buses are hot, but not okay when they're dead.
_________________________
Larry Fine
Fine Electric Co.
fineelectricco.com

Top
#96027 - 11/02/05 02:16 PM Re: Panel -Juction Box
DougW Offline
Member

Registered: 06/08/03
Posts: 1083
Loc: North Chicago, IL
+1 for the idea of a blank cover. I don't know if the OEM make them - it would probably be a job for a local metal fab place - but I think it would be a cleaner look.