The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!

Featured:
   

2017 NEC and Related
2017 NEC
Now Available!

   
Recent Posts
Industrail Control Panel bonding per 409.108
by sparkyinak
Yesterday at 06:29 PM
Calling all Non-US members!! (Non-US only)
by aussie240
12/07/16 02:39 AM
Photo Upload Tutorial
by DanK
12/06/16 11:35 PM
Sprinklered equipment 26-008
by bigpapa
12/02/16 04:24 PM
On Delay Relay with Auto Reset
by Potseal
12/01/16 09:59 AM
New in the Gallery:
12.5A through 0.75mm˛ flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 13
HotLine1 10
sparkyinak 9
Texas_Ranger 8
Potseal 6
Who's Online
0 registered (), 78 Guests and 4 Spiders online.
Key: Admin, Global Mod, Mod
Topic Options
Rate This Topic
#92949 - 04/18/05 08:18 PM Wiring Manner in Russia
Itoh Offline
Junior Member

Registered: 04/11/05
Posts: 3
Loc: Yokohama, Japan
We are working for Russian construction project. According to our Russian partner, wiring methos for 24V DC instrument such as transmitter, solenoid valve, gas detectors, etc. shall be 3-wire system (+/- and earthing). As far as I know, the 3-wire method is very old Russian practice and it is not valid any more. Therefore we understand that europian style 2-wire system (+/- only) is sufficient for 24V DC instrument wiring. Also as far as we checked, we have never found out such code&standard requirement of "3-wire".

Top
2014 / 2011 NEC & Related Books and Study Guides
#92950 - 04/19/05 07:52 AM Re: Wiring Manner in Russia
Webmaster Offline

Administrator
Member

Registered: 10/07/00
Posts: 3142
Loc: NY, USA

Top