The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!

Featured:
   

2017 NEC and Related
2017 NEC
Now Available!

   
Recent Posts
Industrail Control Panel bonding per 409.108
by sparkyinak
Yesterday at 06:29 PM
Calling all Non-US members!! (Non-US only)
by aussie240
12/07/16 02:39 AM
Photo Upload Tutorial
by DanK
12/06/16 11:35 PM
Sprinklered equipment 26-008
by bigpapa
12/02/16 04:24 PM
On Delay Relay with Auto Reset
by Potseal
12/01/16 09:59 AM
New in the Gallery:
12.5A through 0.75mm˛ flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 13
HotLine1 10
sparkyinak 9
Texas_Ranger 8
Potseal 6
Who's Online
0 registered (), 194 Guests and 4 Spiders online.
Key: Admin, Global Mod, Mod
Topic Options
Rate This Topic
#92868 - 04/14/05 10:51 AM Recreational Vehicle Parks (551) Part VII
Yoopersup Offline
Member

Registered: 03/04/03
Posts: 826
Loc: Michigan
What is the mosty cost effect way to wire a Park?? Since voltage Drop is so great The only way I can come up with is several Panels in Different areas with feeders back to the main building Then to the feeders to the Local breakers and outlets.551.77 prohibits Back to Back outlet locationa also. Is there a standard witdth required for theses sites>??

Top
2014 / 2011 NEC & Related Books and Study Guides
#92869 - 04/14/05 07:54 PM Re: Recreational Vehicle Parks (551) Part VII
gfretwell Offline

Member

Registered: 07/20/04
Posts: 9045
Loc: Estero,Fl,usa
The best way is to let the utility do the work at medium voltage with transformers servine a few sites apiece like they do on residential streets. Long runs with 240/120 is always going to be a copper mine.
_________________________
Greg Fretwell

Top
#92870 - 04/15/05 05:00 AM Re: Recreational Vehicle Parks (551) Part VII
George Little Offline
Member

Registered: 01/18/04
Posts: 1492
Loc: Michigan USA
Ernie- I thought the State was responsibie for the infrastructure of this type of installation? I think I'd agree with Greg on this one- The utility can probably do it easier than you. Of course if your getting paid to do it that's a diferent story. Keep me posted.
_________________________
George Little

Top
#92871 - 04/15/05 08:27 AM Re: Recreational Vehicle Parks (551) Part VII
gfretwell Offline

Member

Registered: 07/20/04
Posts: 9045
Loc: Estero,Fl,usa
I imagine the "park" he is talking about is a privately owned RV park. I did several of these that were state owned when I was inspecting. When you actually put pen to paper the size of wire you need at 240v is mind boggling. Most of these new RVs have 50a cords on them and they can use almost every stinking amp of that. Some have 2 big HVAC systems on the roof and every electrical doodad a person would have at home. The parks were originally wired for campers who just wanted a NEMA 5-15 to run a fan, a light and maybe a TV. The state came to the conclusion the only way they could effectivly cover the distances involved was with MV and they deferred to the utility to own that equipment.
_________________________
Greg Fretwell

Top