The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!


2017 NEC and Related
2017 NEC
Now Available!

Recent Posts
Parking lot pole light swap....
by gfretwell
10/24/16 08:46 PM
International Wire Colour Codes
by Tjia1981
10/23/16 12:08 PM
Son of Sparky
by HotLine1
10/20/16 07:43 PM
Speaking of Plugmold ...
by gfretwell
10/17/16 02:37 PM
Broken battery charger? Check for cobwebs!
by gfretwell
10/17/16 02:30 PM
New in the Gallery:
12.5A through 0.75mm≤ flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 14
ghost307 7
HotLine1 7
renosteinke 6
Potseal 4
Who's Online
2 registered (HotLine1, gfretwell), 304 Guests and 6 Spiders online.
Key: Admin, Global Mod, Mod
Topic Options
Rate This Topic
#90245 - 11/09/04 07:33 AM Hybrid System
Steve T Offline

Registered: 02/14/01
Posts: 312
Loc: Oak Park, IL, USA
An owner of a single family home wants to install wind turbines and solar panels on his roof.

In a nutshell--What would you ask for as the plan reviewer who has to review the electrical portion of the job (not structural support)?

I have come up with:
1)A complete one-line diagram showing all associated equipment.

2)Show the location of all the equipment.

3)Provide Manuf. specs on all equipment.

4)Provide the rating of all OCPD's.

5)Provide dc system voltage of PV output circuit and combined turbine and PV output circuit.

6)Provide a letter from the utility giving their approval of the system.

2014 / 2011 NEC & Related Books and Study Guides
#90246 - 11/09/04 08:47 AM Re: Hybrid System
gfretwell Online   content


Registered: 07/20/04
Posts: 9026
Loc: Estero,Fl,usa
Greg Fretwell

#90247 - 11/09/04 03:36 PM Re: Hybrid System
Bjarney Offline

Registered: 04/10/02
Posts: 2561
Loc: West-Southern Inner-Northeast ...
In some areas, typical electrical-standards boilerplate for small PV/inverter installations is IEEE 929, UL 1741 and NEC 690.

#90248 - 11/09/04 06:04 PM Re: Hybrid System
John Steinke Offline

Registered: 04/03/01
Posts: 509
Loc: Reno,Nv., USA
Don't forget a "ladder logic" diagram showing how this mess will be controlled.

#90249 - 11/10/04 06:44 PM Re: Hybrid System
HotLine1 Online   content


Registered: 04/03/02
Posts: 6792
Loc: Brick, NJ USA
OK< sunlight resistant cables, wiring, suitable bushings, connectors, raceways, etc.
Sunlight resistant ty-wraps, discos (utility requirement here)

The other AHJ is the solar cell maven, I'll see if he has a op to stop over here next week


#90250 - 11/10/04 06:54 PM Re: Hybrid System
Roger Offline

Registered: 05/18/02
Posts: 1779
Loc: N.C.
If these Wind Turbines, Solar panels, and associated wiring don't comply, what would an inspector do? AS far as the power they produce, there would be no meter to pull or hold hostage.


#90251 - 11/11/04 05:14 PM Re: Hybrid System
WireWrestler Offline

Registered: 10/29/01
Posts: 43
Loc: Northern IL
We install the same type of systems you are talking about. I assume you are on the ComEd grid. If the systems are to be grid-tied for net metering they must meet the UL1741 spec. mentioned. As far as I know, all of the off the shelf equipment does. I recomend that you go to They have the most information and best wind turbines available. We are dealers for them and they are great.