Would ELV branch circuits be a good idea?
by gfretwell
Yesterday at 01:26 PM
Why cables look like they do
by Texas_Ranger
Yesterday at 12:33 PM
100% breakers?
by Texas_Ranger
01/16/17 06:13 AM
New in the Gallery:
Desk-mounted "power-board"
Top Posters (30 Days)
Webmaster 20
HotLine1 20
gfretwell 13
Trumpy 12
ghost307 12
Who's Online
0 registered (), 0 Guests and 27 Spiders online.
Key: Admin, Global Mod, Mod
Topic Options
Rate This Topic
#90245 - 11/09/04 07:33 AM Hybrid System
Steve T Offline
Member

Registered: 02/14/01
Posts: 312
Loc: Oak Park, IL, USA
An owner of a single family home wants to install wind turbines and solar panels on his roof.

In a nutshell--What would you ask for as the plan reviewer who has to review the electrical portion of the job (not structural support)?

I have come up with:
1)A complete one-line diagram showing all associated equipment.

2)Show the location of all the equipment.

3)Provide Manuf. specs on all equipment.

4)Provide the rating of all OCPD's.

5)Provide dc system voltage of PV output circuit and combined turbine and PV output circuit.

6)Provide a letter from the utility giving their approval of the system.

Top
2017 / 2014 NEC & Related Books and Study Guides
#90246 - 11/09/04 08:47 AM Re: Hybrid System
gfretwell Offline


Member

Registered: 07/20/04
Posts: 9062
Loc: Estero,Fl,usa
Bonding?
_________________________
Greg Fretwell

Top
#90247 - 11/09/04 03:36 PM Re: Hybrid System
Bjarney Offline
Moderator

Registered: 04/10/02
Posts: 2561
Loc: West-Southern Inner-Northeast ...
 
In some areas, typical electrical-standards boilerplate for small PV/inverter installations is IEEE 929, UL 1741 and NEC 690.

Top
#90248 - 11/09/04 06:04 PM Re: Hybrid System
John Steinke Offline
Member

Registered: 04/03/01
Posts: 509
Loc: Reno,Nv., USA
Don't forget a "ladder logic" diagram showing how this mess will be controlled.

Top
#90249 - 11/10/04 06:44 PM Re: Hybrid System
HotLine1 Offline


Member

Registered: 04/03/02
Posts: 6829
Loc: Brick, NJ USA
OK< sunlight resistant cables, wiring, suitable bushings, connectors, raceways, etc.
Sunlight resistant ty-wraps, discos (utility requirement here)

The other AHJ is the solar cell maven, I'll see if he has a op to stop over here next week

John
_________________________
John

Top
#90250 - 11/10/04 06:54 PM Re: Hybrid System
Roger Offline
Member

Registered: 05/18/02
Posts: 1779
Loc: N.C.
If these Wind Turbines, Solar panels, and associated wiring don't comply, what would an inspector do? AS far as the power they produce, there would be no meter to pull or hold hostage.

Roger

Top
#90251 - 11/11/04 05:14 PM Re: Hybrid System
WireWrestler Offline
Member

Registered: 10/29/01
Posts: 43
Loc: Northern IL
We install the same type of systems you are talking about. I assume you are on the ComEd grid. If the systems are to be grid-tied for net metering they must meet the UL1741 spec. mentioned. As far as I know, all of the off the shelf equipment does. I recomend that you go to http://www.bergey.com/ They have the most information and best wind turbines available. We are dealers for them and they are great.
Bob