The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!

Featured:
   

2017 NEC and Related
2017 NEC
Now Available!

   
Recent Posts
Sprinklered equipment 26-008
by bigpapa
Yesterday at 04:24 PM
On Delay Relay with Auto Reset
by Potseal
12/01/16 09:59 AM
Wow, that was close!
by jraef
11/28/16 07:06 PM
Earthquake in New Zeeland
by RODALCO
11/27/16 11:25 PM
Calling all Non-US members!! (Non-US only)
by Tjia1981
11/27/16 06:33 AM
New in the Gallery:
12.5A through 0.75mm˛ flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 14
HotLine1 10
Trumpy 8
Texas_Ranger 8
sparkyinak 7
Who's Online
0 registered (), 82 Guests and 4 Spiders online.
Key: Admin, Global Mod, Mod
Page 1 of 2 1 2 >
Topic Options
Rate This Topic
#88712 - 07/13/04 03:27 AM What does this mean: "subject to severe physical damage"
Joe Tedesco Offline
Member

Registered: 10/07/00
Posts: 3325
Loc: Boston, Massachusetts USA
Rule always said: "358.12 Uses Not Permitted.
EMT shall not be used under the following conditions:
(1) Where, during installation or afterward, it will be subject to severe physical damage."
_________________________
Joe Tedesco, NEC Consultant

Top
2014 / 2011 NEC & Related Books and Study Guides
#88713 - 07/13/04 10:24 AM Re: What does this mean: "subject to severe physical damage"
resqcapt19 Offline
Member

Registered: 11/10/00
Posts: 2209
Loc: IL
Only the AHJ knows!
_________________________
Don(resqcapt19)

Top
#88714 - 07/13/04 05:16 PM Re: What does this mean: "subject to severe physical damage"
Dave55 Offline
Member

Registered: 05/08/04
Posts: 666
Loc: Crystal Lake, Illinois, USA
I think where it might get hit with a snowplow would qualify.

Dave

Top
#88715 - 07/13/04 05:37 PM Re: What does this mean: "subject to severe physical damage"
Lostazhell Offline
Member

Registered: 02/21/04
Posts: 1248
Loc: Bakersfield, CA (Originally Or...
Is corrosion considered "physical damage"?

-Randy

Top
#88716 - 07/13/04 05:43 PM Re: What does this mean: "subject to severe physical damage"
Bjarney Offline
Moderator

Registered: 04/10/02
Posts: 2561
Loc: West-Southern Inner-Northeast ...
Snowplows and forklifts.

Isn't the time aspect, "...during installation or afterward..." a more recent addition to the rule? Before—always was just implied, I suppose.




[This message has been edited by Bjarney (edited 07-13-2004).]

Top
#88717 - 07/13/04 06:01 PM Re: What does this mean: "subject to severe physical damage"
Roger Offline
Member

Registered: 05/18/02
Posts: 1779
Loc: N.C.
Well here is an example I think is understandable (atleast as much as we have per the NEC)



On the left I think we have "physical damage"
On the right we are probably looking at closer to "severe physical damage"



Roger

Top
#88718 - 07/14/04 06:22 PM Re: What does this mean: "subject to severe physical damage"
PCBelarge Offline
Member

Registered: 06/08/03
Posts: 657
Loc: Dobbs Ferry, NY, USA
Joe
We have been mulling that over here for a while, and come up with the AHJ decision as well - but that doesn't bode well for some guys who have to deal with the ' ' inspector type.

Very good Roger

Pierre
_________________________
Pierre Belarge

Top
#88719 - 07/14/04 06:48 PM Re: What does this mean: "subject to severe physical damage"
Roger Offline
Member

Registered: 05/18/02
Posts: 1779
Loc: N.C.
Thanks Pierre. I hope you and the new company are doing well.

How is your better half doing?

Roger

Top
#88720 - 07/14/04 06:53 PM Re: What does this mean: "subject to severe physical damage"
ga.sparky56 Offline
Member

Registered: 11/24/02
Posts: 582
Loc: young harris georgia usa
My guess is,it'd be a common-sense type of thing. If it's in an area with vehicle traffic,EMT's probably a bad idea.

Russell

Top
#88721 - 07/14/04 06:54 PM Re: What does this mean: "subject to severe physical damage"
HotLine1 Offline

Member

Registered: 04/03/02
Posts: 6804
Loc: Brick, NJ USA
AS an inspector....I honestly could not differentiate "severe" and "regular" physical damage.

Is 'severe' damage the EMT being flattened to 1/8" thickness? Damage is damage I would have to say. Determining future possibilities for damage has to be a basic common sense move on the EC's part.

Joe; you picked a real good point!!

John
_________________________
John

Top