ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals

ECN Shout Chat
Top Posters(30 Days)
Admin 19
Recent Posts
Anyone hiring inspectors?
by HotLine1. 03/27/17 08:03 AM
Old decora style outlets
by Admin. 03/25/17 11:40 AM
ESA Arc flash course
by TheShockDoctors. 03/24/17 10:15 AM
fuse rejectors
by HotLine1. 03/24/17 07:53 AM
Another Forum Update
by Admin. 03/22/17 03:04 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
231,627 Are you busy
166,458 Re: Forum
160,717 Need opinion
Who's Online Now
0 registered members (), 63 guests, and 10 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#86465 - 10/29/03 07:59 AM Water PipeRun Over Switchboard  
Joe Tedesco  Offline
Member
Joined: Oct 2000
Posts: 2,749
Boston, Massachusetts USA
[Linked Image]

The copper water pipe was run over the electrical equipment lower than permitted, but is there a real hazard?

Would you allow this if there were no joints over the area above this equipment?

If so, by what authority?


Joe Tedesco, NEC Consultant

2017 / 2014 NEC & Related Books and Study Guides

#86466 - 11/04/03 09:28 PM Re: Water PipeRun Over Switchboard  
John Steinke  Offline
Member
Joined: Apr 2001
Posts: 518
Reno,Nv., USA
I believe that the NEC requires switchboards/switchgear to be in dedicated spaces....
The hazard presented is the risk of condensation forming & then dripping into the gear.
If you're in Reno for the NFPA conference, you might ask the Atlantis casino about the drain they ran over their gear- they blew a breaker that cost them 20K, and a poco transformer as well, darkening part of the town.



Member Spotlight
HappyElectrician
HappyElectrician
Penn USA
Posts: 31
Joined: December 2011
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.010s Queries: 14 (0.004s) Memory: 0.7416 MB (Peak: 0.8582 MB) Zlib enabled. Server Time: 2017-03-28 08:14:50 UTC