The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!

Featured:
   

2017 NEC and Related
2017 NEC
Now Available!

   
Recent Posts
Industrail Control Panel bonding per 409.108
by sparkyinak
12/09/16 06:29 PM
Calling all Non-US members!! (Non-US only)
by aussie240
12/07/16 02:39 AM
Photo Upload Tutorial
by DanK
12/06/16 11:35 PM
Sprinklered equipment 26-008
by bigpapa
12/02/16 04:24 PM
On Delay Relay with Auto Reset
by Potseal
12/01/16 09:59 AM
New in the Gallery:
12.5A through 0.75mm˛ flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 13
HotLine1 10
sparkyinak 9
Texas_Ranger 8
Potseal 6
Who's Online
0 registered (), 81 Guests and 4 Spiders online.
Key: Admin, Global Mod, Mod
Topic Options
Rate This Topic
#84638 - 04/15/03 06:10 AM MORE THAN SIX
GEO Offline
Member

Registered: 03/12/03
Posts: 50
Loc: Lancaster,Pa
company owned high voltage gear outside--comes to MDP(150') inside with more than six breakers. your thoughts THANK YOU GEO

Top
2014 / 2011 NEC & Related Books and Study Guides
#84639 - 04/15/03 07:41 AM Re: MORE THAN SIX
resqcapt19 Offline
Member

Registered: 11/10/00
Posts: 2209
Loc: IL
225.32 Exception #1?
Don
_________________________
Don(resqcapt19)

Top
#84640 - 04/15/03 07:17 PM Re: MORE THAN SIX
sparky806 Offline
Member

Registered: 12/07/02
Posts: 59
Loc: Shawnee, KS, USA
I recently had a similar situation. 2- 2000amp mdp's withs 6 switches each from one 750kva poco padmount. AHJ made me install 2-2000amp fused switches on outside of building. Lots of work, but a good money maker.