The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!


2017 NEC and Related
2017 NEC
Now Available!

Recent Posts
International Wire Colour Codes
by Texas_Ranger
Today at 08:24 AM
Son of Sparky
by HotLine1
10/20/16 07:43 PM
Speaking of Plugmold ...
by gfretwell
10/17/16 02:37 PM
Broken battery charger? Check for cobwebs!
by gfretwell
10/17/16 02:30 PM
230 or 345 kV transmission lines?
by annemarie1
10/12/16 01:23 PM
New in the Gallery:
12.5A through 0.75mm˛ flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 11
renosteinke 6
HotLine1 6
ghost307 5
Potseal 4
Who's Online
0 registered (), 216 Guests and 4 Spiders online.
Key: Admin, Global Mod, Mod
Topic Options
Rate This Topic
#83652 - 02/11/03 12:00 PM General wiring
EVAD7 Offline

Registered: 03/11/02
Posts: 37
Loc: MN
Does a system need to be extended throughout the entire building? for example, three phase 4w 240 Volt, Feeder just for 3 phase load, Do you carry the neutral even if it isn't used?

2014 / 2011 NEC & Related Books and Study Guides
#83653 - 02/11/03 12:36 PM Re: General wiring
Pearlfish Offline

Registered: 09/12/02
Posts: 83
Loc: Chicago Ridge, Il, USA
It depends on how forward-thinking you want to be. You didn't give enough information for a better answer. It's cheaper to install a little extra now, than re-do the work later. What if you need to install some control circuits?

#83654 - 02/11/03 12:44 PM Re: General wiring
EVAD7 Offline

Registered: 03/11/02
Posts: 37
Loc: MN
This is a code question,is there any requirement to extend the system in each feeder?

#83655 - 02/11/03 02:09 PM Re: General wiring
Len_B Offline

Registered: 01/19/03
Posts: 56
Loc: New Hampshire
There is no requirement to install a neutral in a feeder or branch circuit that does not utilize it.

#83656 - 02/11/03 03:06 PM Re: General wiring
Redsy Offline

Registered: 03/28/01
Posts: 2138
Loc: Bucks County PA
What you're saying rings a bell, but I can't find it.

#83657 - 02/11/03 04:29 PM Re: General wiring
Ron Offline

Registered: 03/13/02
Posts: 577
Loc: White Plains, NY
The neutral needs to be brought to the main disconnect if it is a 3 phase 4 wire service.