The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!


2017 NEC and Related
2017 NEC
Now Available!

Recent Posts
Parking lot pole light swap....
by ghost307
10/24/16 06:25 AM
International Wire Colour Codes
by Tjia1981
10/23/16 12:08 PM
Son of Sparky
by HotLine1
10/20/16 07:43 PM
Speaking of Plugmold ...
by gfretwell
10/17/16 02:37 PM
Broken battery charger? Check for cobwebs!
by gfretwell
10/17/16 02:30 PM
New in the Gallery:
12.5A through 0.75mm˛ flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 13
HotLine1 7
ghost307 7
renosteinke 6
Potseal 4
Who's Online
1 registered (mbhydro), 315 Guests and 4 Spiders online.
Key: Admin, Global Mod, Mod
Topic Options
Rate This Topic
#82939 - 12/22/02 04:51 PM Tired of looking
gisbon Offline

Registered: 04/17/02
Posts: 13
Loc: Naples, Fl, USA
Could someone please tell me the NEC article which states the line has to be on top and load on the bottom of a breaker or disconnecting means. I have done it that way forever and now need to prove where it is located in the NEC. Or is it?

Thank You,

Merry Christmas to all and a very safe Holiday.

2014 / 2011 NEC & Related Books and Study Guides
#82940 - 12/22/02 06:33 PM Re: Tired of looking
Gwz Offline

Registered: 04/29/02
Posts: 199
That is not in the NEC, BUT

If the CB is marked " Line " then the incoming power is connected to the " Line " terminals of the CB what-ever the position ( top, bottom, sideways. 110.3(B).

#82941 - 12/22/02 06:34 PM Re: Tired of looking
Wirenuttt Offline

Registered: 11/10/02
Posts: 267
Loc: Massachusetts
My understanding of line load was always manufacturers specs. I might be wrong but I don't belive there is anything in the code book for this.

#82942 - 12/22/02 07:49 PM Re: Tired of looking
HotLine1 Offline


Registered: 04/03/02
Posts: 6792
Loc: Brick, NJ USA
IMHO, think about this:
The "line" side of a fused disconnect is connected to the bottom "open" the disco to replace a fuse....the fuse is "hot", and so are the knives that you opened.....

How many of us have come upon this scenario??

Just put a untrained person, DIY'er, homwowner, or the new apprentice in the above situation!

How about the guys that "back feed" a 2 or 3 pole CB???

Manufacturers instructions are supposed to be followed. Somewhere there is/was a reference about the disconnect switch isolating the fuses when the switch was "open".


#82943 - 12/23/02 06:19 AM Re: Tired of looking
Wirenuttt Offline

Registered: 11/10/02
Posts: 267
Loc: Massachusetts
One old reference in the code to all knife blade disconnects not to be installed as to allow gravity to close them.

#82944 - 12/26/02 05:54 PM Re: Tired of looking
Redsy Offline

Registered: 03/28/01
Posts: 2138
Loc: Bucks County PA
Article 404.7 requires that on vertically mounted swiches the up position of the handle shall be the on position.
I also recall the explanation that refers to gravity tending to open a switch as opposed to closing it.

#82945 - 12/27/02 04:49 AM Re: Tired of looking
electure Offline


Registered: 12/24/00
Posts: 4226
Loc: Fullerton, CA USA
HotLine's post brings up another point.
When testing (always) disconnects and breakers, be sure to not only test line to ground, but line to line as well, lest you run into an ungrounded delta system that will show no voltage to ground (but might be hot 480).
Some of the younger folks have worked just on Y systems, and the delta never even seems to enter their minds.
Just the thought of it makes me ill ...S