The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!


2017 NEC and Related
2017 NEC
Now Available!

Recent Posts
Son of Sparky
by HotLine1
Yesterday at 07:43 PM
Speaking of Plugmold ...
by gfretwell
10/17/16 02:37 PM
Broken battery charger? Check for cobwebs!
by gfretwell
10/17/16 02:30 PM
230 or 345 kV transmission lines?
by annemarie1
10/12/16 01:23 PM
Is this a fix or just a bandaid?
by gfretwell
10/10/16 06:49 PM
New in the Gallery:
12.5A through 0.75mm² flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 11
renosteinke 6
HotLine1 6
ghost307 5
sparky 4
Who's Online
0 registered (), 107 Guests and 7 Spiders online.
Key: Admin, Global Mod, Mod
Topic Options
Rate This Topic
#80905 - 06/10/02 04:21 AM How to Remove Knockouts by NEMA
Joe Tedesco Offline

Registered: 10/07/00
Posts: 3325
Loc: Boston, Massachusetts USA
How to remove knockouts. Bulletin by NEMA 1954, 1999.

[This message has been edited by Joe Tedesco (edited 06-10-2002).]
Joe Tedesco, NEC Consultant

2014 / 2011 NEC & Related Books and Study Guides
#80906 - 06/11/02 08:32 AM Re: How to Remove Knockouts by NEMA
WNYJim Offline

Registered: 06/06/02
Posts: 39
Loc: Rochester, NY, USA
It would be great if all of the KOs came out like the attachment shows. I have good luck removing the the center KO, then use the angled diagonal pliers to cut the next ring between the tabs on each side (180 degrees apart). Then each half can be removed without destroying the next ring.

#80907 - 06/11/02 01:15 PM Re: How to Remove Knockouts by NEMA
Bjarney Offline

Registered: 04/10/02
Posts: 2561
Loc: West-Southern Inner-Northeast ...
The date on the NEMA page is perfect.

I raised the issue a few years back to a meter-socket manufacturing engineer [if here's any place that nipple/raceway lineup is not easy] and he mentioned that keeping sets of one-pass concentric punches and dies sharp is a pain and costs a lot of money for a year’s worth of stamping.

He seemed nice on the phone and followed up with a letter offering to quote ‘less knockouts and hub openings’ on quantities of 100+ sockets, provided, of course, no UL labeling was needed. (!) He balked at asking for three.

The same outfit did keep a good inventory of NOKO versions of cans and gutters, and I took advantage of that perk.

#80908 - 06/29/02 09:51 AM Re: How to Remove Knockouts by NEMA
Tom Baker Offline

Registered: 10/09/01
Posts: 31
Loc: Bremerton WA
I don't like KO's on meter sockets either. Once I had to repair a meter that someone had pushed in one of the KO's put in a very large firecracker, and shot the meter out into a lake. The once square meter socket was then round. We never found the meter.

I always use gutters with no KO's. They are readily available and easier to lay out.


ECN Electrical Forums - sponsored by Electrical Contractor Network - Electrical and Code Related Discussion for Electrical Contractors, Electricians, Inspectors, Instructors, Engineers and other related Professionals