The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!

Featured:
   

2017 NEC and Related
2017 NEC
Now Available!

   
Recent Posts
Sprinklered equipment 26-008
by twh
Today at 06:28 AM
On Delay Relay with Auto Reset
by Potseal
Yesterday at 09:59 AM
Wow, that was close!
by jraef
11/28/16 07:06 PM
Earthquake in New Zeeland
by RODALCO
11/27/16 11:25 PM
Calling all Non-US members!! (Non-US only)
by Tjia1981
11/27/16 06:33 AM
New in the Gallery:
12.5A through 0.75mm˛ flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 15
HotLine1 10
Trumpy 8
Texas_Ranger 8
sparkyinak 7
Who's Online
2 registered (jraef, LongRunner), 188 Guests and 4 Spiders online.
Key: Admin, Global Mod, Mod
Topic Options
Rate This Topic
#80084 - 02/23/02 06:27 PM Baseball fields and disco's
Anonymous
Unregistered


I am currently working on a baseball field installing a new second service that will be used by part of the league. The existing 100A service has a disconnect set directly under the meter at the power pole. (The pole is about 100yds from the pressbox.) I am planning on tapping on to the existing weather head at the press box and going directly through it to the other side via conduit. Does anyone see a problem with this? We use the "3 foot" rule here in PA, which requires our panel to be located within 3 feet of where the service penetrates the wall. If the distance is further, a disconnect must be installed. I do not see any violation here since there is a disconnect already on the load side of the meter. Have I missed something?

Top
2014 / 2011 NEC & Related Books and Study Guides
#80085 - 02/24/02 01:27 PM Re: Baseball fields and disco's
electure Offline

Member

Registered: 12/24/00
Posts: 4226
Loc: Fullerton, CA USA
How do you plan on tapping off of an "existing weatherhead"?

Top
#80086 - 02/24/02 02:53 PM Re: Baseball fields and disco's
Anonymous
Unregistered


The meter for this service is about 100 yds away. From the pole with the meter and the disconnect on it, the cable is swung over to the pressbox via tri-plex and into a weather head, which punches through the wall into the back of the panel. What we plan to do is to "bug" onto the triplex before the weather head.