ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals

ECN Shout Chat
Top Posters(30 Days)
Admin 16
Recent Posts
ESA Arc flash course
by TheShockDoctors. 03/24/17 10:15 AM
fuse rejectors
by HotLine1. 03/24/17 07:53 AM
Another Forum Update
by Admin. 03/22/17 03:04 PM
Dining room plugs
by watersparkfalls. 03/21/17 10:31 PM
TRUE POWER
by jraef. 03/21/17 09:13 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
231,352 Are you busy
166,085 Re: Forum
160,550 Need opinion
Who's Online Now
1 registered members (HotLine1), 58 guests, and 11 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#80084 - 02/23/02 10:27 PM Baseball fields and disco's  
Anonymous
Unregistered

I am currently working on a baseball field installing a new second service that will be used by part of the league. The existing 100A service has a disconnect set directly under the meter at the power pole. (The pole is about 100yds from the pressbox.) I am planning on tapping on to the existing weather head at the press box and going directly through it to the other side via conduit. Does anyone see a problem with this? We use the "3 foot" rule here in PA, which requires our panel to be located within 3 feet of where the service penetrates the wall. If the distance is further, a disconnect must be installed. I do not see any violation here since there is a disconnect already on the load side of the meter. Have I missed something?


2017 / 2014 NEC & Related Books and Study Guides

#80085 - 02/24/02 05:27 PM Re: Baseball fields and disco's  
electure  Offline


Member
Joined: Dec 2000
Posts: 4,259
Fullerton, CA USA
How do you plan on tapping off of an "existing weatherhead"?


#80086 - 02/24/02 06:53 PM Re: Baseball fields and disco's  
Anonymous
Unregistered

The meter for this service is about 100 yds away. From the pole with the meter and the disconnect on it, the cable is swung over to the pressbox via tri-plex and into a weather head, which punches through the wall into the back of the panel. What we plan to do is to "bug" onto the triplex before the weather head.



Member Spotlight
Samurai
Samurai
Fl.
Posts: 46
Joined: May 2007
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.009s Queries: 14 (0.002s) Memory: 0.7470 MB (Peak: 0.8698 MB) Zlib enabled. Server Time: 2017-03-24 23:59:49 UTC