The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!

Featured:
   

2017 NEC and Related
2017 NEC
Now Available!

   
Recent Posts
Calling all Non-US members!! (Non-US only)
by aussie240
Yesterday at 02:39 AM
Photo Upload Tutorial
by DanK
12/06/16 11:35 PM
Sprinklered equipment 26-008
by bigpapa
12/02/16 04:24 PM
On Delay Relay with Auto Reset
by Potseal
12/01/16 09:59 AM
Wow, that was close!
by jraef
11/28/16 07:06 PM
New in the Gallery:
12.5A through 0.75mm˛ flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 13
HotLine1 9
Texas_Ranger 8
sparkyinak 7
Trumpy 6
Who's Online
0 registered (), 170 Guests and 4 Spiders online.
Key: Admin, Global Mod, Mod
Topic Options
Rate This Topic
#80072 - 02/19/02 11:52 AM Generator connection
smurrell Offline
Junior Member

Registered: 02/19/02
Posts: 1
What code in NEC covers adding a generator receptical to a pump control panel, where the main power source is from the pole (the generator is backup)? Does the generator need a transfer switch to prevent accidental shorting to the pole power per the code?

Top
2014 / 2011 NEC & Related Books and Study Guides
#80073 - 02/19/02 12:49 PM Re: Generator connection
Tom Offline
Member

Registered: 01/01/01
Posts: 1069
Loc: Shinnston, WV USA
Try Article 702 Optional Standby Systems. You will need some type of transfer equipment.

Also, every electric utility that I've ever dealt with has a requirement regarding this. It would be best if you checked with them to see what their requirements are.

Tom
_________________________
Few things are harder to put up with than the annoyance of a good example.

Top
#80074 - 03/02/02 09:05 AM Re: Generator connection
tdhorne Offline
Member

Registered: 03/22/01
Posts: 344
Loc: Maryland, USA
The cheapest way out is to connect the pump controller to the service by cord and plug. This will allow you to just plug it into the cord from the generator.
_________________________
Tom Horne

"This alternating current stuff is just a fad. It is much too dangerous for general use" Thomas Alva Edison

Top
#80075 - 03/03/02 04:47 PM Re: Generator connection
circuit man Offline
Member

Registered: 11/05/01
Posts: 287
Loc: saluda,s.c.
all cases say that you should have a double pole double throw switch or an automatic transfer switch. this is to protect power line personel from back feed. which you most likely well be held accountable for. again check with the power supplier.ERWIN