Would ELV branch circuits be a good idea?
by gfretwell
01/17/17 01:26 PM
Why cables look like they do
by Texas_Ranger
01/17/17 12:33 PM
100% breakers?
by Texas_Ranger
01/16/17 06:13 AM
New in the Gallery:
Desk-mounted "power-board"
Shout Box

Top Posters (30 Days)
HotLine1 20
Webmaster 19
gfretwell 13
Trumpy 12
ghost307 12
Who's Online
1 registered (Webmaster), 0 Guests and 67 Spiders online.
Key: Admin, Global Mod, Mod
Topic Options
Rate This Topic
#66663 - 06/12/06 07:20 PM Can't get there from here!
arseegee Offline
Member

Registered: 01/28/02
Posts: 321
Loc: Statesboro, GA USA
Just wondering how you guys might tackle this. I am doing the build outs on a few retail stores in a new strip center. We start a sunglass hut tomorrow.

Here's the question. CG that handled the erection and exterior work of the structure had an EC run the pipe for service laterals back to the xmfmr pads. All lateral pipes are 4" EPVC. Well all our services are only 200A and POCO requires us to use their can which only goes to 2.5" on the bottom KO's.

I wont go into how bad the pipes are out of plumb... it's a real mess.

I have seen this done with PVC (water pipe) reducing bushings and it looks like a hack job. Any advice on how to get from 4" to 2.5" and have it look respectable?

Top
Work Gear for Electricians and the Trades

Work Gear for Electricians and the Trades
Work Gear for Electricians and the Trades
Arc Flash Clothing, Gloves, KneePads, Tool Belts, Pouches, Tool Carriers, etc. etc....

#66664 - 06/12/06 08:24 PM Re: Can't get there from here!
JCooper Offline
Member

Registered: 12/30/02
Posts: 229
Loc: Kendall Park, NJ USA
Any chance of putting a gutter between your lateral and the poco can?

Top
#66665 - 06/13/06 06:45 AM Re: Can't get there from here!
earlydean Offline
Member

Registered: 12/22/03
Posts: 749
Loc: Griswold, CT, USA
I would consider installing a flush handhole a couple of feet out from the hut. If the dirt is already paved, then, I would consider a "C" condulet with a reducing bushing. You did indicate the riser is not too plumb. So, maybe the gutter idea is the only one that will work.
_________________________
Earl

Top
#66666 - 06/13/06 08:20 AM Re: Can't get there from here!
resqcapt19 Offline
Member

Registered: 11/10/00
Posts: 2209
Loc: IL
Assuming that EPVC is electrical PVC conduit, then Carlon makes a 4 x 3 bell reducer. Maybe you could use that along with a 3 x 2.5 PVC reducing bushing.