The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!


2017 NEC and Related
2017 NEC
Now Available!

Recent Posts
Parking lot pole light swap....
by gfretwell
Yesterday at 08:46 PM
International Wire Colour Codes
by Tjia1981
10/23/16 12:08 PM
Son of Sparky
by HotLine1
10/20/16 07:43 PM
Speaking of Plugmold ...
by gfretwell
10/17/16 02:37 PM
Broken battery charger? Check for cobwebs!
by gfretwell
10/17/16 02:30 PM
New in the Gallery:
12.5A through 0.75mm˛ flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 14
HotLine1 7
ghost307 7
renosteinke 6
Potseal 4
Who's Online
0 registered (), 291 Guests and 5 Spiders online.
Key: Admin, Global Mod, Mod
Topic Options
Rate This Topic
#65417 - 05/02/06 05:45 PM meter socket wiring question
rowd Offline

Registered: 09/13/02
Posts: 31
Loc: Park Forest, Illinois, USA
I'm installing a new single phase, 3-wire meter socket to meter a single 400 watt light on a apt. building.
I'm doing twenty of these, each with it's own meter.
I tapped one leg of the phase and the neutral to the line side of the new meter socket from the existing PoCo lines coming into the building. Then running the neutral and one load conductor to the breaker panel supplying the light.
PoCo comes out to install the meter and says the socket is wired wrong.
My question is:
Does the socket require both phases of power to operate the meter? I've looked in a couple of socket enclosures to see how they were wired previously and found one wired with the neutral jumpered to the line side of the phase that was not being used and another was wired with both phases to the line side but only one conductor running from the load to the breaker box supplying the light.
What am I doing wrong?

Work Gear for Electricians and the Trades

Work Gear for Electricians and the Trades
Work Gear for Electricians and the Trades
Arc Flash Clothing, Gloves, KneePads, Tool Belts, Pouches, Tool Carriers, etc. etc....

#65418 - 05/02/06 05:56 PM Re: meter socket wiring question
Redsy Offline

Registered: 03/28/01
Posts: 2138
Loc: Bucks County PA
Try looking at this, but check with your utility company first tering.pdf

Page 41

[This message has been edited by Redsy (edited 05-02-2006).]

#65419 - 05/03/06 04:30 PM Re: meter socket wiring question
circuit man Offline

Registered: 11/05/01
Posts: 287
Loc: saluda,s.c.
rowd, check out hiialeah they have wiring diagrams for all types of meter sockets.if i'm not wrong you would put the hot on the left hand line stab run neutral through middle,then run a jumper to the right hand stab. sounds like the power compny doesn't like the idea of providing a form 1S meter that is designed for this application.this meter is usually rated 100cl 120 volt two wire.most meters that the power company uses for residental service are form 2S class 200 240 volt 3 wire. these reguire the 2 hot legs.why do they want to meter each 400 watt seperate? why not use a sub meter if it's to bill each customer, & use one main house meter.hialeah & several others can provide these for you, unless there not allowed in your area.

#65420 - 05/03/06 04:49 PM Re: meter socket wiring question
NORCAL Offline

Registered: 09/25/02
Posts: 805

#65421 - 05/03/06 05:30 PM Re: meter socket wiring question
Roger Offline

Registered: 05/18/02
Posts: 1779
Loc: N.C.
If you continue to have headaches over this meter problem after checking out the provided links, you might want to ask your doctor about Damitol.


#65422 - 05/03/06 05:49 PM Re: meter socket wiring question
NJwirenut Offline

Registered: 09/15/01
Posts: 816
Loc: Bergen County, NJ
You need to connect the neutral to a screw terminal on the back of the meter, and disconnect a jumper link. Explained at: