#61255 - 01/20/06 04:27 AM Residential Service
sandro2 Offline
Member
Registered: 03/26/05
Posts: 49
Loc: philadelphia,PA
A 200 amp residential service with the Pipe installation inside of the home?
-needs to be encased in concrete
-Can the pipe be EMT?
-Also what is the disconnect rule as far as the distance of the pipe before installing a disconnect
Top
Work Gear for Electricians and the Trades
#61256 - 01/20/06 07:16 AM Re: Residential Service
electricman786 Offline
Member
Registered: 09/17/04
Posts: 37
Loc: sacramento
Y dont u use pvc if u going 2 encase it in concrete.
Top
#61257 - 01/20/06 07:55 AM Re: Residential Service
raider1 Offline
Member
Registered: 07/08/05
Posts: 46
Loc: north logan, utah, US
If you are talking about the service entrance conductors, then you must meet the requirements of 230.6 to be considered outside of the building.

EMT can be installed in concrete if 358.10(B) is meet.

230.70(A)(1) says "inside nearest the point of entrance of the service conductors." Only the AHJ can determine what is "nearest the point of entrance." Some AHJ have allowed 5 feet but you will want to check with your local AHJ.

Chris
Top
#61258 - 01/22/06 01:54 AM Re: Residential Service
e57 Offline
Member
Registered: 05/27/03
Posts: 2876
Loc: S.F.,CA USA
This is one of the widest varying regional items around. Some AHJ allow nothing inside, some allow no encasement for 40'+! Really depends on where you are, and what is allowed there. This is definatley a question for your local inspector, and POCO.
_________________________
Mark Heller
"Well - I oughta....." -Jackie Gleason
Top
#61259 - 01/22/06 08:48 AM Re: Residential Service
Celtic Offline
Member
Registered: 02/26/05
Posts: 361
Loc: NJ
My AHJ will allow 5' inside...I have a situation where I need 8' and I don't want to put in a meter main stack. The AHJ will allow my installation ONLY if the entire load side of the meter is RGC ~ no concrete required.

You will get varying details from people.

Your best bet is to ask the AHJ that is inspecting (another AHJ - even if the same jurisdiction - *might* not allow what the other agrees to).
_________________________
~~ CELTIC ~~
...-= NJ =-...
Top

Member Spotlight
Member Since: 12/24/00
Posts: 4259
New in the Gallery:
SE cable question
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box


Who's Online
0 registered (), 87 Guests and 9 Spiders online.
Key: Admin, Global Mod, Mod
 
New in the Gallery:
SE cable question
 
Top Posters (30 Days)
Admin 47
HotLine1 43
gfretwell 19
Ruben Rocha 12
Trumpy 9
 
Newest Members
Scotto, Freecrowder, clee512, Jdscott2005, FAIZAN

ECN Electrical Forums - sponsored by Electrical Contractor Network - Electrical and Code Related Discussion for Electrical Contractors, Electricians, Inspectors, Instructors, Engineers and other related Professionals