ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals

ECN Shout Chat
Top Posters(30 Days)
Admin 19
Recent Posts
Anyone hiring inspectors?
by HotLine1. 03/26/17 06:12 PM
Old decora style outlets
by Admin. 03/25/17 11:40 AM
ESA Arc flash course
by TheShockDoctors. 03/24/17 10:15 AM
fuse rejectors
by HotLine1. 03/24/17 07:53 AM
Another Forum Update
by Admin. 03/22/17 03:04 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
231,537 Are you busy
166,260 Re: Forum
160,670 Need opinion
Who's Online Now
0 registered members (), 54 guests, and 12 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#61140 - 01/17/06 05:14 PM 400A Disconnect ahead of CT  
NJ_WVUGrad  Offline
Member
Joined: Jan 2006
Posts: 47
Neptune, NJ, USA
Installing a 400A CT which is tapped out of a Trough feeding 3 other services (wireless telecom site - each carrier has a trailer).
The trough is fed UG from a pole mounted transformer.

PoCo (JCPL in North NJ) is requiring a 400A disconnect ahead of the CT cabinet so they can work on CT's without shutting off service to the whole site.

I explained that the other services all have 8hr of battery backup (which is true) and shutdown would not effect them. Yet they still insist on the 400A Non-Fused Disc.

It burns me because its not outlined in their Electrical Service Manual and the fact that it is being installed for their convenience. I assume they will be sealing it themselves to prevent tapping unmetered.

Has anyone run into this or similar?


Work Gear for Electricians and the Trades

#61141 - 01/17/06 06:06 PM Re: 400A Disconnect ahead of CT  
shortcircuit  Offline
Member
Joined: Jun 2004
Posts: 608
massachusetts
Cold sequence for a CT cabinet is required by my local POCO also. They want the option to kill the power for servicing...

shortcircuit


#61142 - 01/17/06 06:52 PM Re: 400A Disconnect ahead of CT  
HotLine1  Offline


Member
Joined: Apr 2002
Posts: 6,802
Brick, NJ USA
NJ:
JCP&L & PSE&G require cold sequence in 'certain' installs. It's always a "GOOD POLICY" to speak to the wiring inspector/field engineer before you do any job.

Yes, they have requirements for the 'main' enclosure to be sealable, as it is ahead of the meter, and can be considered 'access' to unmetered power.

John


John


Member Spotlight
Alan Belson
Alan Belson
Mayenne N. France
Posts: 1,803
Joined: March 2005
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.014s Queries: 14 (0.003s) Memory: 0.7498 MB (Peak: 0.8733 MB) Zlib enabled. Server Time: 2017-03-27 02:55:56 UTC