The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Featured:

2017 NEC and Related
2017 NEC
Now Available!

Recent Posts
Members: Did you know?
by Admin
37 minutes 25 seconds ago
Safety at heights?
by HotLine1
Yesterday at 08:51 PM
International Wire Colour Codes
by Texas_Ranger
Yesterday at 03:29 PM
Looking for older post
by Texas_Ranger
Yesterday at 03:22 PM
Last time to chat here
by Trumpy
01/20/17 11:41 PM
New in the Gallery:
Desk-mounted "power-board"
Shout Box

Top Posters (30 Days)
Admin 36
HotLine1 20
Ruben Rocha 17
gfretwell 16
Trumpy 15
Who's Online
1 registered (Admin), 81 Guests and 10 Spiders online.
Key: Admin, Global Mod, Mod
Topic Options
Rate This Topic
#61140 - 01/17/06 01:14 PM 400A Disconnect ahead of CT
NJ_WVUGrad Offline
Member
Registered: 01/17/06
Posts: 48
Loc: Neptune, NJ, USA
Installing a 400A CT which is tapped out of a Trough feeding 3 other services (wireless telecom site - each carrier has a trailer).
The trough is fed UG from a pole mounted transformer.

PoCo (JCPL in North NJ) is requiring a 400A disconnect ahead of the CT cabinet so they can work on CT's without shutting off service to the whole site.

I explained that the other services all have 8hr of battery backup (which is true) and shutdown would not effect them. Yet they still insist on the 400A Non-Fused Disc.

It burns me because its not outlined in their Electrical Service Manual and the fact that it is being installed for their convenience. I assume they will be sealing it themselves to prevent tapping unmetered.

Has anyone run into this or similar?
Top
Work Gear for Electricians and the Trades
#61141 - 01/17/06 02:06 PM Re: 400A Disconnect ahead of CT
shortcircuit Offline
Member
Registered: 06/27/04
Posts: 608
Loc: massachusetts
Cold sequence for a CT cabinet is required by my local POCO also. They want the option to kill the power for servicing...

shortcircuit
Top
#61142 - 01/17/06 02:52 PM Re: 400A Disconnect ahead of CT
HotLine1 Offline


Member
Registered: 04/03/02
Posts: 6833
Loc: Brick, NJ USA
NJ:
JCP&L & PSE&G require cold sequence in 'certain' installs. It's always a "GOOD POLICY" to speak to the wiring inspector/field engineer before you do any job.

Yes, they have requirements for the 'main' enclosure to be sealable, as it is ahead of the meter, and can be considered 'access' to unmetered power.

John
_________________________
John