The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!

Featured:
   

2017 NEC and Related
2017 NEC
Now Available!

   
Recent Posts
Sprinklered equipment 26-008
by bigpapa
Yesterday at 04:24 PM
On Delay Relay with Auto Reset
by Potseal
12/01/16 09:59 AM
Wow, that was close!
by jraef
11/28/16 07:06 PM
Earthquake in New Zeeland
by RODALCO
11/27/16 11:25 PM
Calling all Non-US members!! (Non-US only)
by Tjia1981
11/27/16 06:33 AM
New in the Gallery:
12.5A through 0.75mm˛ flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 15
HotLine1 10
Trumpy 8
Texas_Ranger 8
sparkyinak 7
Who's Online
0 registered (), 97 Guests and 5 Spiders online.
Key: Admin, Global Mod, Mod
Page 1 of 2 1 2 >
Topic Options
Rate This Topic
#55184 - 08/19/05 05:02 PM Plan review
renosteinke Offline
Cat Servant
Member

Registered: 01/22/05
Posts: 5305
Loc: Blue Collar Country
I'd like to pose an ethical question:

Suppose you are reviewing plans, preparing your bid- and you find something wrong.
Do you:
A) Ask the customer about it now;
B) Bid as drawn, counting on a change order later; or,
C) Keep your mouth shut, and do as specified?

Top
Work Gear for Electricians and the Trades

Work Gear for Electricians and the Trades
Work Gear for Electricians and the Trades
Arc Flash Clothing, Gloves, KneePads, Tool Belts, Pouches, Tool Carriers, etc. etc....

#55185 - 08/19/05 05:49 PM Re: Plan review
Dnkldorf Offline
Member

Registered: 12/12/04
Posts: 1091
Loc: nowhere usa
(A)

It makes you look like you know what you are doing, when you can spot things early on.

Then they tell you to go ahead and do (B), anyway, because they don't know your answer to (A).

Then halfway through the job, you wish you could of just done (C).


Dnk......

Top
#55186 - 08/19/05 06:47 PM Re: Plan review
HotLine1 Offline

Member

Registered: 04/03/02
Posts: 6804
Loc: Brick, NJ USA
With my EC hat on....we primarily do "design-build" for steady accounts. When we do 'plan' jobs (usually tenant fit-up) we bring errors and omissions 'out' ASAP to the owner/agent, or to the Arch/EE.

As an AHJ, "Plan Review" is basically for NEC compliance, and to cross check the permit items to the plans. 'Errors and omissions'???? you bet!!

John
_________________________
John

Top
#55187 - 08/19/05 07:42 PM Re: Plan review
LK Offline

Member

Registered: 01/21/03
Posts: 1721
Loc: New Jersey
John,

Intresting, i wonder how many EC's that do plan jobs have E&O coverage, i bet not that many, we carry E&O and our insurance rates show it, when they put in those low bids, you can be sure they are not covered.

Top
#55188 - 08/20/05 05:32 AM Re: Plan review
Roger Offline
Member

Registered: 05/18/02
Posts: 1779
Loc: N.C.
During the bid process if there is time, we will ask questions if something jumps out, then the Architect/Engineer can send out an addendum or clarification to all bidders.

On large jobs the Architect/Engineer and Owner should (and most times do) require bidders to attend a pre bid conference for this very reason. When a group of potential contractors bring their questions to the table, many errors and omissions come up in most plans and specs, and this will generate the corrections before the bid opening.

There will always be some problems that will result in Change Orders regardless of these efforts though.

Roger

Top
#55189 - 08/20/05 02:41 PM Re: Plan review
renosteinke Offline
Cat Servant
Member

Registered: 01/22/05
Posts: 5305
Loc: Blue Collar Country
This part of the bidding process is where a lot of game playng takes place.

It seems that there are many contractors who deliberately bid under their costs, relying on change orders to create a substantial profit later on. I suspect these guys don't inform the customer of the necessary changes before the job is awarded.


Another tack is to visit the job you lost, and look for ways to demonstrate that the guy who did get the job is in some way not meeting specs- then pointing that out to the customer, hoping to financially punish the other guy.

Top
#55190 - 08/20/05 04:09 PM Re: Plan review
gfretwell Offline

Member

Registered: 07/20/04
Posts: 9045
Loc: Estero,Fl,usa
When I was with big blue, making and accepting bids we got hammered both ways. If the subs that bid to us missed something we ate it and if we missed something in the bid to the end customer we ate it. That is probably why IBM never really made any money with "services".
I have to say I did really try to make the scope of work match the customer expectations and I would speak up as soon as I saw a problem. It saved money in the long run.


[This message has been edited by gfretwell (edited 08-20-2005).]
_________________________
Greg Fretwell

Top
#55191 - 08/21/05 12:53 AM Re: Plan review
Trumpy Offline

Member

Registered: 07/05/02
Posts: 8540
Loc: SI,New Zealand
Darned good call John.
I'd not only go back to the customer, but I would contact the person that drew the plans too.
Keeping your mouth shut only ends in arguments further down the track and doesn't help anyone.
With respect to showing up on a job you never got, that would be way out of line here.
To start running the guy down that did get the job would not only be un-professional, but it would also be wasting your billable time.
You would be losing on both fronts.

[This message has been edited by Trumpy (edited 08-21-2005).]
_________________________
Let's face it, these days if you're not young, you're old - Red Green grin

Top
#55192 - 08/21/05 04:25 AM Re: Plan review
Dnkldorf Offline
Member

Registered: 12/12/04
Posts: 1091
Loc: nowhere usa
As for going back to the jobs you lost, Why not. I do it.

But not for the reasons stated here, I don't go back and try to bash the guy that won the job, I go back to see how he/she did it, what I might of missed, and what corners might of been cut. All without saying a word.

This gives me an idea of how someone else accomplishes the same task, what materials were used, and maybe some pointers on what to look out for the next time.

Everyone can nick-pick someone elses work, and that is very unprofessional, Heck if you look hard enough, I'm sure everyones work could be a little better, even mine.


Dnk......

Top
#55193 - 08/21/05 04:26 AM Re: Plan review
Dnkldorf Offline
Member

Registered: 12/12/04
Posts: 1091
Loc: nowhere usa
LK, what is E&O insurance, and what does it cover, and why do you need it?

Never heard of it before.

Can you elaborate?


Dnk........

Top