The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!

Featured:
   

2017 NEC and Related
2017 NEC
Now Available!

   
Recent Posts
Industrail Control Panel bonding per 409.108
by sparkyinak
Yesterday at 03:17 PM
Calling all Non-US members!! (Non-US only)
by aussie240
12/07/16 02:39 AM
Photo Upload Tutorial
by DanK
12/06/16 11:35 PM
Sprinklered equipment 26-008
by bigpapa
12/02/16 04:24 PM
On Delay Relay with Auto Reset
by Potseal
12/01/16 09:59 AM
New in the Gallery:
12.5A through 0.75mm˛ flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 13
HotLine1 9
Texas_Ranger 8
sparkyinak 8
Trumpy 6
Who's Online
0 registered (), 192 Guests and 6 Spiders online.
Key: Admin, Global Mod, Mod
Page 1 of 2 1 2 >
Topic Options
Rate This Topic
#54158 - 07/20/05 11:52 PM finish job
electricman786 Offline
Member

Registered: 09/17/04
Posts: 37
Loc: sacramento
How one would price a job if he has to bid on residensial finish only.
Thanks in advance.

Top
Work Gear for Electricians and the Trades

Work Gear for Electricians and the Trades
Work Gear for Electricians and the Trades
Arc Flash Clothing, Gloves, KneePads, Tool Belts, Pouches, Tool Carriers, etc. etc....

#54159 - 07/21/05 12:18 AM Re: finish job
macmikeman Offline
Member

Registered: 07/16/02
Posts: 718
Loc: Honolulu, Hawaii
Are you going to accept responsibility for someone's work that is now conceiled behind the drywall?. Ok I will bite- Do the job for cash. Wear a fake mustache and a fake beard. Make up a phony name for yourself and drive up in a rented car. Wear latex gloves so you don't leave fingerprints. Ask up front for $100,000 dollars.

Top
#54160 - 07/21/05 07:37 AM Re: finish job
watthead Offline
Member

Registered: 10/13/01
Posts: 182
Loc: South Carolina
Yeah up front. Will they pay you when they didn't pay the last guy?

Top
#54161 - 07/21/05 07:53 AM Re: finish job
kinetic Offline
Member

Registered: 04/06/02
Posts: 158
Loc: Phoenix, Arizona
I have only done one job like this. The electrical contractor ran off and quit on the contractor. Make sure you have detailed documentation on anything you see and all work you perform. Make sure your contract states you are only providing a warranty for your work and are not responsible for anything but your work. Daily work equals daily pay......in cash. Make sure to add alot of markup for the hassles that may come later.

Top
#54162 - 07/21/05 08:14 AM Re: finish job
Tiger Offline
Member

Registered: 05/04/05
Posts: 714
Loc: Crystal Lake, IL USA
If the rough work looks perfect, do it and write on the invoice "XX Electric not reponsible for work done by others". If the rough work looks any less than perfect, walk away from it. Don't be shy about taking pictures, or having the homeowner sign something about the rough being done by an EC.

In this area most journeymen use conduit, most weekend warriors use NM, so it's easy to tell. Otherwise, I'd look for all bracket boxes with rings, and no small boxes.

Dave

Top
#54163 - 07/21/05 03:54 PM Re: finish job
LK Offline

Member

Registered: 01/21/03
Posts: 1721
Loc: New Jersey
"Are you going to accept responsibility for someone's work that is now conceiled behind the drywall? "
_____________________________________________

I would walk away , no not walk, but run.

Top
#54164 - 07/21/05 04:46 PM Re: finish job
e57 Offline
Member

Registered: 05/27/03
Posts: 2837
Loc: S.F.,CA USA
Showed up at something like that today.... New client/GC wants us to pick up "punchlist" from an EC he found out was unlicensed, and disappeared. Got there and there is wire hanging out everywhere, no make up on grounds, small boxes, over-packed, un-marked panel, no AFCI's, etc. And, the real kicker, NO GROUND OR BONDING AT ALL ON A NEW 200A SERVICE.

Telling the boss tommorrow we should have no more to do with the joint! Or start over...
_________________________
Mark Heller
"Well - I oughta....." -Jackie Gleason

Top
#54165 - 07/21/05 06:28 PM Re: finish job
electricman786 Offline
Member

Registered: 09/17/04
Posts: 37
Loc: sacramento
I was reffered to job by rocker. Gc is owner contractor. House is big and in expensive area on a hill here in Ca. Gc said he moved from Conecticut and electrician was from there too. Work looks ok as long you see in boxes. Breakers has been installed and wires in panle marked. I asked Gc that if it has been tested. He said no. Also told him that I will not be responsible for rough. He said ok. I never done it before seperate. My own rough and finish. Thats why asked experts advise. After all liabilty is involved in any way after I touch it.

Top
#54166 - 07/21/05 09:02 PM Re: finish job
Tiger Offline
Member

Registered: 05/04/05
Posts: 714
Loc: Crystal Lake, IL USA
I wouldn't take it as a good sign that the breakers were installed, or am I the only one that installs breakers last?

Dave

Top
#54167 - 07/21/05 10:24 PM Re: finish job
sierra electrician Offline
Member

Registered: 02/12/05
Posts: 220
Loc: North Fork, CA USA
Just bid it and Bid High!
All trouble shooting should be performed on a T&M Basis.


JMO
Rob